Summary
Overview
Work History
Education
Skills
Certification
Personal Information
Projects
Timeline
Generic
JEGAN VASU NATH KASINATHAN

JEGAN VASU NATH KASINATHAN

Transformation Consultant
RAWANG,10

Summary

Experienced and enthusiastic Consultant with track record of success across wide range of industries. Possesses exceptional interpersonal, problem-solving and analytical skills to provide advice and expertise to client organizations improving business performance. Experienced in all aspects of operations, strategy and finance.

Overview

17
17
years of professional experience
7
7
Certifications

Work History

Transformational Consultant

NTT
6 2021 - Current
  • Perform Baseline analysis of client infrastructure (Server, Storage, Backup and Database)
  • Understand current infrastructure to provide suitable technical solution
  • Propose solution to deploy new projects from Infrastructure perspective
  • Prepare server specification based on application requirement and make sure the sizing is done correctly
  • Server, Storage sizing requirement based on the baseline analysis
  • Prepare High Level Design document for the proposed solution
  • Prepare Solution Specification document to guide client to analyse available tool in the market
  • Perform vendor comparison when required
  • Work closely with vendors on Bill of Material based on project requirement
  • Present the High Level design of the proposed solution to the client
  • Advise on Application Migration Strategy & Design, including conduct strategy Discovery Workshop
  • Advise on Data Centre Strategy & Design, including conduct strategy Discovery Workshop
  • Advise on Mobility Strategy & Design, including conduct strategy Discovery Workshop
  • Advise on Service Integration & Management Strategy Design, including conduct strategy Discovery Workshop
  • Advise on Systems Strategy & Design, including conduct strategy Discovery Workshop
  • Perform Business Continuity Management Assessment
  • Prepare Service Operation Blueprint for IT Operations.

Sr. Technical Consultant

Hitachi Vantara
03.2020 - 05.2021
  • Perform zoning configuration (Cisco & Brocade)
  • Host connectivity for VSP Series and HUS VM series (Windows, AIX, Solaris, Linux & VMware)
  • Data migration
  • True Copy and Universal Replicator configuration
  • ISL / Port Channel Configuration
  • Host knowledge on AIX, Solaris, HPUX, and Windows and VMware
  • Planning and executing multiple LIVE DR exercise
  • Performance analysis (Tuning Manager / DCNM)
  • Troubleshooting issues related to SAN
  • Performed DC migration and RDM migration for TD banks virtualized farm
  • Decommission of old infra.

Solution Architect

Maybank Berhad
10.2018 - 03.2020
  • Develop and document the proposed technical design for the integration and implementation of any new software into existing environment
  • Create detailed plans for the integration of new systems architecture into existing infrastructure
  • Analyse existing systems to ensure they offer adequate security and are effectively meeting the needs of the organization
  • Analyse business requirements to identify where they can integrate new hardware, operating systems, or connectivity solutions
  • Prepare RFQ for the internal Maybank Projects
  • Prepare technical Write Up and LPTM for Maybank (MSS)
  • Come up with solution to deploy new projects from Infrastructure perspective
  • Perform solution comparison in terms of bank’s direction and overall cost
  • Work closely with Application team to understand the requirement of the project and provide infrastructure solution
  • Bring in new technology to the bank and perform comparison in terms of functionality and cost
  • Work closely with vendors on pricing if dedicated infrastructure is needed
  • Understand current Network infrastructure to provide correct technical solution
  • Produce Technical write ups/ RFQ/ LPTM for every SR created
  • Every solution provided has to be functional and cost effective
  • Prepare server specification based on application requirement and make sure the sizing is done correctly
  • Perform ESX/ HCI cluster sizing with vendor team for new projects (Project Under CAPEX model)
  • Perform Capacity planning for Storage, backup and IOPS sizing for new project that requires new deployment
  • Analysed and Prepared RFP for Object Storage deployment in Maybank
  • (Technical Committee Member).

Sr. Delivery Specialist

DELL EMC
06.2009 - 10.2019
  • Perform hardware setup (Clariion, Celerra & Avamar)
  • SAN Switch (Cisco & Brocade) installation and configuration
  • Perform zoning configuration (Cisco & Brocade)
  • Hardware and Code upgrade (Clariion, Celerra, Cisco, Brocade)
  • Host connectivity for Clariion (Windows, AIX, Solaris, Linux & VMware)
  • NAS configuration and hardware setup (CIFS & SMB)
  • CLARiiON Hardware conversion
  • Data migration
  • Mirrorview, snapview and SAN copy configuration
  • Avamar implementation
  • DMX & VMAX - Hardware setup
  • DMX - VMAX - Host Connectivity
  • SRDF configuration
  • BCV Configuration
  • Storage and Switch Migration (VxVM, LVM, SAN Copy, Open Replicator, Open Migrator, PPME and Storage VMotion)
  • ISL Configuration
  • Isilon Host Connectivity (NFS / SMB Configuration)
  • Host knowledge on AIX, Solaris, HPUX, and Windows
  • Recover Point Implementation
  • VPLEX Implementation
  • XtremIO Implementation
  • Unity Implementation
  • (SAN and NAS implementation)
  • Planning and executing multiple LIVE DR exercise
  • Perform a baseline study of existing environment before migration project.

Field Technical Support Consultant

Hewlett Packard
08.2007 - 06.2009
  • Hardware support for HP server, storage, and solution
  • Support HPUX
  • Installation of HPUX
  • Installation of SAN storage (EVA)
  • Configuring SAN switch
  • Familiar with MC Service Guard
  • Familiar with vPar and nPar technology
  • Familiar with Integrity Virtual Machine (IVM).

Education

B.Sc. Computer Science/ IT -

INTI COLLEGE (Coventry University)

Diploma in Computer Science/Information Technology - undefined

APIIT

Skills

  • Storage Migration (Storage Host Level)

  • Business Continuity (SRDF BCV)

  • SAN Storage

  • SAN Switch

  • VMAXVNX

  • ISILON

  • CLARIION

  • CLERRA

  • EVA

  • Unity

  • XtremeIO

  • VSP5000

  • Backup Software

  • LINUX ADMINISTRATION

  • Firewall

  • Solaris

  • AIX

  • HPUX

Certification

EMCISA

Personal Information

  • Age: 38
  • Nationality: Malaysian

Projects

Maybank Tech Refresh, 2014, 2015, Planning and executing the Tech Refresh project for Maybank Berhad. The migration consist of 100 host and involves 2 CX4. Various migration technique has been used to achieve the objective to migrate all the servers. Tools such as Open Replicator, SAN copy, AIX LVM, VxVM, Open Migrator were used to perform the migration. Preparing the migration checklist for each every migration for the change committee. Also, have stand in as a Resident Engineer for Maybank when it’s required. In total, have done 2 years for residency duty for Maybank. Maybank Tech Refresh project, 2016, 2017, Planning and executing the Tech Refresh project for Maybank Berhad. The migration consist of 300 host and involves CX4, VNX, DMX and VMAX40K. Planning involves getting EMC Grabs and analysing each and every host. This includes understanding how the storage being used as (VxVM, LVM or RAW) device. Planning also includes the study of compatibility matrix for each and every servers. In terms of host – storage compatibility and also host - SAN switch compatibility. Planning for the new array also has to be done in terms of studying the FA port utilization. To make sure all the FA’s are used in balanced manner and no performance issue will arise once the migration is done. Studying the host software such as Powerpath for storage compatibility. Planning also involves, prioritizing of servers and strategizing the overall migration plan. In terms of which servers should be migrated first based on application tier and business urgency. Briefing application owners on how each migration will be done and what are the benefits for them. Also, show them the detailed migration plan and failover steps in case if migration fails. Various migration technique has been used to achieve the objective to migrate all the servers. Tools such as Open Replicator, SAN copy, AIX LVM, VxVM, Open Migrator were used to perform the migration. Apart from Storage, the SAN switch migration also need to be done concurrently. (Cisco MDS9710) Leading the migration team from EMC point of view (Scheduling, Deciding the migration tool and approach, Assigning task to team members, verify their steps are correct before being executed, meeting application owner to get the downtime, present performance improvement.) Preparing the migration checklist for each every migration for the change committee. This will include all the migration steps for the change committee to understand the migration flow. Planning and executing the ISL for the N5K switches for the new SAN environment. Start up the initial copy prior to the cutover downtime. (Open Replicator initial sync / LVM VG mirror/ VXVM plex mirror). Perform pre migration check before cutover is done. Make sure cutover is done in a clean manner and there is no issues with the migrated data. Once data migration is complete, create SRDF replication to DR site for business continuity purpose. Provide weekly update to migration committee to track the project status, discuss issues raised during the migration. Provide monthly update to application owners / stake holders, IT head and PL leads on the improvement achieved in terms of storage performance. Maybank Everest project - Datacentre Relocation, 2018, Leading the project execution from DELL / EMC point of view. Planning the whole storage replication to the new storage array in the new Datacentre. Planning and executing the storage migration for the New DC. Setup the new array and SAN environment for the New DC. Replication tools such as SRDF and Recover Point used to setup the new DR site. CIMB Next Gen PaaS - Consultancy, 2021, 2022, Perform Baseline analysis of client infrastructure (Server, Storage, Backup and Database). Understand current infrastructure to provide correct technical solution. Come up with solution to deploy new projects from Infrastructure perspective. Prepare server specification based on application requirement and make sure the sizing is done correctly. Perform ESX/ HCI cluster sizing calculation. Storage sizing based on the baseline analysis. Prepare High Level Design document for the proposed solution. Prepare Solution Specification document to guide client to analyse available tool in the market. Perform vendor comparison when required. Work closely with vendors on Bill of Material based project requirement. Present the High Level design of the proposed solution to the client.

Timeline

Sr. Technical Consultant

Hitachi Vantara
03.2020 - 05.2021

Solution Architect

Maybank Berhad
10.2018 - 03.2020

Sr. Delivery Specialist

DELL EMC
06.2009 - 10.2019

Field Technical Support Consultant

Hewlett Packard
08.2007 - 06.2009

Transformational Consultant

NTT
6 2021 - Current

B.Sc. Computer Science/ IT -

INTI COLLEGE (Coventry University)

Diploma in Computer Science/Information Technology - undefined

APIIT
JEGAN VASU NATH KASINATHANTransformation Consultant