Perform in-depth troubleshooting of complex PCBA failures (electronic circuit & device or software-related).
Analyze alarm history, error logs, and test results to identify root causes.
Apply appropriate corrective actions (use the correct RFC) to bring PCB failure back to production-ready status.
Leveraged strong problem-solving skills to quickly diagnose complex PCBA issues and implement effective solutions.
Supported new product introductions (NPI) by ensuring PCBA equipment was fully function (FT Tester), leading to a smooth transition of new products into production without delays.
Participated in the qualification and correlation of new equipment (new FT Tester), contributing to the successful adoption of new tools and processes for next-generation products.
Maintained comprehensive documentation of board data failure, maintenance activities, and performance data for future reference.
Support hard board debugging to reduce the hard board failure.
Provided technical support to operators, addressing issues promptly to minimize disruption to workflows. (FT Test BKM)
Enhanced production efficiency with thorough troubleshooting and repair of malfunctioning equipment. (FT Tester Equipment calibration)
Ensured zero quality defects in PCBA assembly during the shift by performing real-time troubleshooting and quick interventions.
Facilitated training sessions for new technicians, fostering a collaborative learning environment and enhancing team capabilities.
Evaluated facilities equipment and interpreted data.
Supervised team of 7 staff members.
Documented and resolved [CPU socket bent pin] which led to [Zero bent pin issue].
Production Technician (Debug)
Jabil Circuit (M) Sdn. Bhd.
Penang
12.2003 - 04.2005
Troubleshot failing PCBA board from ICT (In Circuit Test) & FT (Functional Test).
Team work to sustain the daily failure below 10% & met the production requirement.
Escalate smoothly for any 3-time same failure for further solution.
Technician II (Debug)
Solectron (M) Sdn. Bhd.
Prai, Penang
05.2000 - 04.2003
Troubleshot failing PCBA board from ICT (In Circuit Test) & FT (Functional Test).
Team work to sustain the daily failure below 10% & met the production requirement.
Escalate smoothly for any 3-time same failure for further solution.
Work as a team with Failure Analysis Engineer for Hard Board Failure to find out the root cause & long-term solution (2 board per day).
Assembly Production Tech (Internship)
SONY Electronic (M)
Prai, Penang
07.1996 - 12.1996
Sustaining the product (Super Audio amplifier & Hi-Fi Audio) met the daily requirement by 0 failed for Functional & Quality Test.