Summary
Overview
Work History
Education
Skills
Websites
Certification
Awards
Affiliations
Software
Timeline
Generic
Ir Ts Sezu Pathy

Ir Ts Sezu Pathy

Electrical Manager
Shah Alam

Summary

Professional electrical manager with proven expertise in managing complex projects and leading teams to achieve high-impact results. Skilled in electrical systems design, troubleshooting, and preventative maintenance. Known for strong focus on collaboration, adaptability to changing needs, and unwavering commitment to meeting deadlines and performance targets. Valued for technical proficiency, leadership, and reliability in delivering results.

Overview

15
15
years of professional experience
5
5
Certifications
3
3
Languages

Work History

Electrical Manager MY

Linde
08.2021 - Current
  • Manage 34 sites in Malaysia for Overall Electrical facilities
  • Responsible for operation, engineering, installation and maintenance of electrical systems including the operating sites and Remote Operating Centre.
  • Monitor functioning and maintenance of critical components including High, Medium and Low voltage substations and switchgears, Motor Control Centers and Variable Frequency Drives.
  • Lead site teams and train them to improve reliability of the plant assets and certify the external stakeholders like contractors and suppliers.
  • Conduct reliability and safety audits of electrical systems, related work flows and endure follow up action on the same.
  • Design and implement upgrade processes for existing condition based maintenance strategies and the associated data.
  • Define scope and costing of projects, testing & commissioning of critical equipment and major modifications of the existing electrical systems.
  • Drive preventive and predictive maintenance, Root Cause analysis and reliability improvement.
  • Minimize electrical system downtime by sharing lessons from reliability events and training the site teams to be competent in troubleshooting emergency situations.
  • Additionally responsible for predictive and preventive maintenance of Battery & UPS system, Electrical control systems, Motors, heaters, Power generators, Transformers, portable electrical consumers Lighting and grounding.
  • Key Achievements:
  • 132KV GIS Major Servicing
  • Replacement of oil filled to dry type termination kit for GIS and TX for 132KV system
  • Improvement of TCS HV switchgears and UV release coil for all HV motor feeder.
  • Improvement of non industrial AC UPS
  • Reliability improvement for HV motors RC damper from Surge Capacitor and Online PDM monitoring
  • Electrical Lead for plant relocation/refurbishment
  • Surge Arrestor installation and technical guide
  • Implementation of Maintenance program for slip ring motor which using resistance starter

Senior Electrical Maintenance Engineer

PETRONAS
08.2020 - 07.2021
  • Provide technical and operational expertise for the day-to-day support of the electrical equipment, systems and infrastructure within the Integrated Complex including:
  • Delivering engineering assessments and design, trouble-shooting and root cause failure analysis, long-term equipment improvement initiatives and engineering solutions to issues in the field, and development of equipment strategies.
  • Participating in activities (and leading where necessary) related to safety and risk assessment and in safety incident investigations related to electrical equipment.
  • Understand and apply industry, Company and local site electrical safety concepts, practices and requirements, including shock hazard, arc flash hazard, grounding, isolation and lock-out tag-out (LOTO).
  • Collaborate with multi discipline maintenance engineer in developing/delivering training as needed for young Engineers/techs.
  • Analyze maintenance records to determine electrical equipment failure rates, availability/reliability calculations, bad actor/failure modes identification, and program effectiveness/cost analysis.
  • Review and examine electrical equipment test records and results that may include, but is not limited to, transformer oil analysis, cable integrity testing, equipment thermography, and electric motor integrity.
  • Lead the development of electrical surveillance program to prevent premature failure of equipment.
  • Conduct criticality assessment and develop equipment strategies / maintenance plans for electrical systems, taking into consideration industry standards, regulatory requirements, and manufacturer recommendations.
  • Execute electrical life cycle management programs which include electrical equipment inventory, obsolescence plans, managing spare parts, and upgrade / replacement planning.
  • Support electrical system maintenance and test planning, software upgrades, ESD testing, offline and online testing, and coordination of activities with/without plant shutdowns.

Senior Project Electrical Engineer

PETRONAS
03.2018 - 07.2020
  • In-charge of the installation, precommissioning and commissioning activity of 6 nos. 275kV Main Substation and 11 nos of Unit substations which consist various electrical equipments (275kV Gas Insulated SIEMENS Switchgear, 33kV Gas Insulated SIEMENS Switchgear, 11kV and 3.3KV SCHNEIDER switchgears, 400V ABB switchgear, 275kV Power Transformer i.e. 90MVA, 80 MVA, 75MVA, Distribution Transformer i.e. 33/11kV 16MVA, 33/0.4kV 1MVA, 11/0.4kV 2MVA Transformer, overall ENMCS, IMCS, and etc.) as well other critical field electrical equipments (i.e. 5 nos of EDG stations which consist of various number of 3MVA EDG,) that is supporting the plant operations.
  • PIC to supervise and monitor 33KV underground power cable laying, jointing, termination and testing for all main mainsubstation.
  • Coordinating all related critical vendor packages to support construction work and clarifying technical related issues which relates to installation, precommissioning and commissioning of electrical subsystem and system.
  • Technical pre-comm and commissioning support in term of design with field engineering team and take part interfacing with other related packages.
  • Clarify and discuss technical related issues related to engineering design of the project and give construction, pre-commissioning and commissioning support for the completion of subsystem and system before system handover.
  • Pre-commissioning and commissioning support for electrical equipment packages to obtain mechanical completion and afterwards to fulfill all the requirement and sequence prior to energisation.

Project Engineer

PETRONAS
08.2016 - 02.2018
  • Represent PETRONAS at project site and to provide management oversight for all phases of the construction for EPCC Project (Raw Water Treatment Plant).
  • Responsible for Electrical works coordination, completion and quality of the project within time limit and without any HSE issue.
  • Ensure Petronas's Quality Objectives are established and properly implemented.
  • To manage the group of people which include labor, engineers, consultants and others related to Electrical works.
  • To manage/check all the Suruhanjaya Tenaga requirement for the project.
  • Coordinate with related vendors/contractor for all Electrical equipment testing and acceptance which includes for stages like construction, precommissioning and commissioning.
  • Ensure that specifications are being followed and work proceeding on schedule and within budget.

Reliability Engineer

01.2015 - 07.2016
  • Develop, plan, monitor and review implementation of all maintenance programmed for all Electrical Equipment (i.e. Predictive, Preventive, Reactive, Etc.) To minimize plant equipment breakdown and unscheduled plant shutdown, hence sustenance of plant operation.
  • Analyze, diagnose and predict potential equipment failures and recommend engineering solutions to avoid unscheduled breakdown and / or reduce recurrence of problems.
  • Assist in turnaround / shutdown plan & monitor turnaround / shutdown activities to achieve completion within schedule, which include preparation of job scope, identification materials and resources and scheduling and supervision on the execution.
  • Review availability and advise critical spare parts requirement to eliminate / avoid delay in maintenance activities.
  • To improve plant equipment reliability through defect elimination.
  • Conduct safety audit, develop job hazard analysis (JSA) and implement HSE initiative in accordance to HSE regulation and policy to achieve zero lost time accident / incident (LTA / LTI) in all maintenance activities.
  • Develop, prepare and control maintenance budget for each financial year for availability of sufficient budget.
  • Develop and review maintenance work procedures to ensure compliance to PTS and best practices.
  • Identify / shortlist contractors, develop contract strategy and manage the contractor's performance to ensure cost effectiveness.
  • Special Projects:
  • ABB LEAP study for 11 KV generator and preventive and predictive maintenance plan improvement.
  • Capacitor bank controller upgrading which include feasibility, functionality and economic study.
  • DC UPS 5 years study. To conduct study on current DC UPS. Studies includes spare part availability, retrofitting the UPS, and feasibility study to convert it to modular system.

Electrical Engineer

12.2012 - 12.2014
  • Provide support to electrical maintenance team and operation to ensure continuous electrical supply for plant operation.
  • Develop database for electrical equipment to ease and become point of reference for all Electrical Engineer.
  • Develop Plan Preventive Maintenance (PPM) for Electrical Equipment. Prepare schedule for electrical equipment, task list and check list.
  • Review and analyse Preventive Maintenance result and plan for Proactive Maintenance if found any deterioration as to avoid failure during operation.
  • Search for specification, create specification in system, propose, and make purchasing for stock, evaluate the proposal, inspect the parts arrive before stock at warehouse.
  • Involve and lead in root cause analysis study for identified electrical equipment as to solve the problem and avoid repetitive.
  • Execution of Predictive Maintenance Activity (PDM) to HV and LV switchboard (11kV, 3.3kV and 415V), selected motor, step down transformer (132kV to 11kV, 11kV to 3.3kV, 11kV to 415V) and cable. The activities involve partial discharge monitoring, tangent delta, thermography and ultrasonic sonic scanning.
  • Prepare for budget data submission and utilise the expenditure according to approve OPEX and CAPEX.
  • Proposed and handle electrical equipment plant improvement activity. Define and presented the problem statement to management of change (MOC) committee, study for solution and shared the proposal.
  • Special Project:
  • Gas Turbine Generator (11kV) maintenance servicing which involve job planning which includes scope of work preparation, job hazard analysis and execution at site.
  • PCFK Short Circuit, Relay Coordination and Arc Flash Study at UET.
  • PCFK Risk Assessment of HV Ex 'N' Motor Driving Flammable Gas Compressor in Zone 2 Area.
  • Troubleshooting of E-57-04 heater. Able to modify the termination of the heater although one element shorted to earth. Reduce the downtime of the equipment since it's a long lead item.

Electrical Engineer

Malakoff Corporation Berhad
11.2011 - 12.2012
  • Responsible to supervise and instruct technician in plant maintenance works / troubleshooting works.
  • Responsible to manage defect raised by Operation Department through CMMS (Computer Maintenance Management System).
  • Provide support to electrical maintenance team and operation to ensure continuous electrical supply for plant operation.
  • Responsible to plan and schedule for Electrical Maintenance like Corrective, Preventive and Predictive Maintenance.
  • Responsible to create and prepare standard operating procedure for Electrical Maintenance work.
  • Design, implement, maintain and improve Electrical equipments, facilities and components for Power Plant.
  • Confer with engineers and contractors to discuss existing or potential engineering projects.
  • Involve in root cause analysis study for identified electrical equipment as to solve the problem and avoid repetitive.
  • Develop new Plan Preventive Maintenance (PPM) for Electrical Equipment. Prepare schedule for electrical equipment, task list and check list.
  • Special Projects:
  • Investigation on Tripping Incident at Unit 30 11KV Unit Board A. Team leader to investigate the tripping issue of Unit 30 11KV Unit Board A which lead to tripping of the whole system of Unit 30 boiler and also loss of 700MW output power.
  • Silo Vent Filter Pulse Jet Controller. Proposed to replace purging system because the current system using an obsolete system/purging sequence card. The obsolete system was designed and bought during commissioning from India. So it will cost a lot to change the whole system to the brand new updated system. So volunteered to do the purging system by using Mitsubishi PLC. Since the plant having the software which can develop ladder diagram, I used the software to develop the purging sequence (ladder diagram). I successfully created better sequence compared to the original design by introducing timer and double confirmation sequence which make the purging better, reliable and efficient.

Trainee

Sony Electronics
04.2010 - 06.2010

Education

Bachelor of Engineering - Electrical

Universiti Teknologi Malaysia
04.2001 -

Skills

Electrical System Studies

Electrical Maintenance

Energy Management

Electrical Condition Based Monitoring(CBM)

Registered Energy Manager (T2)

Thermographer Level 1

Electrical Technical Trainer

Certification

ACPE (BEM)

Awards

  • Focused Recognition from Head of UF plant
  • Country Appreciation Award (Growth Award)

Affiliations

NSC 19 Committer Member - Jabatan Standard Malaysia (JSM)

Professional Engineer (PE) - BEM

Registered Energy Manager (T2) - Energy Commission (ST)

ASEAN Chartered Professional Engineer - BEM

Professional Technologist - MBOT

Corporate Member (MIEM) - IEM

Level 1 - Certified Infrared Thermographer - Infraspection Institute


Software

ETAP

Microsoft Office

SAP S/4HANA

Timeline

Electrical Manager MY

Linde
08.2021 - Current

Senior Electrical Maintenance Engineer

PETRONAS
08.2020 - 07.2021

Senior Project Electrical Engineer

PETRONAS
03.2018 - 07.2020

Project Engineer

PETRONAS
08.2016 - 02.2018

Reliability Engineer

01.2015 - 07.2016

Electrical Engineer

12.2012 - 12.2014

Electrical Engineer

Malakoff Corporation Berhad
11.2011 - 12.2012

Trainee

Sony Electronics
04.2010 - 06.2010

Bachelor of Engineering - Electrical

Universiti Teknologi Malaysia
04.2001 -
Ir Ts Sezu PathyElectrical Manager