Summary
Overview
Work History
Education
Skills
Work Availability
Certification
Quote
Timeline
Generic
Ir. Ts. Ammar Bin Alamshah

Ir. Ts. Ammar Bin Alamshah

Resident Engineer
CHERAS,Kuala Lumpur

Summary

Experienced Resident Engineer with over 15 years of experience in Power Industry. Excellent reputation for resolving problems and improving customer satisfaction. Certified by Suruhanjaya Tenaga as Competent Electrical Engineer (132kV), Electrical Service Engineer (33kV) and Registered Electrical Energy Manager (REEM). Registered with Board of Engineers, Malaysia (BEM) as a Professional Engineer with Practising Certificate (PEPC), registered with Malaysia Board of Technologist (MBOT) as a Professional Technologist in Electrical & Electronic field, and registered with Institute of Engineers, Malaysia (IEM) as a Corporate Member.

Overview

6
6
Certifications
8
8
years of post-secondary education
14
14
years of professional experience

Work History

Resident Engineer

Gas District Cooling Malaysia Sdn Bhd
Kuala Lumpur , Kuala Lumpur
2020.03 - Current
  • Perform electrical energy isolation and restoration for high voltage up to 132kV in electrical main intake and chill water producing plant.
  • Lead shutdown works involving maintenance, calibration, repairing and upgrading of switchgears, transformers, capacitor banks, generators, protection relays, underground power cables, batteries, UPSs, and NERs.
  • Lead the introduction of renewable energy project for integration of solar energy facility into existing electricity power supply
  • Prepared cost estimates, schedules and project specifications for proposals.
  • Interacted with state and local agencies concerning compliance with codes and regulations.
  • Conducted system analysis using ETAP software.
  • Used Microsoft Excel to process data compiled from field for performance assessments.
  • Trained electrical engineers on operation & maintenance on overall productivity for chill water producing plant.
  • Analyzed contractor productivity for maintenance works.
  • Specified material for maintenance use in alignment with environmental concerns and budget constraints.
  • Conferred with shareholders and supervisors about project progress and explained setbacks to minimize worry and secure project funding.
  • Reduced power supply downtime through effective multitasking on design, engineering and maintenance.
  • Promoted and implemented continuous process improvements company-wide.
  • Drafted new and updated designs based on latest international standards and best practices.
  • Verified construction documentation conformed to quality assurance standards and client requirements.
  • Followed up with external contractors, project owners and other stakeholders to gather information and resolve issues.
  • Supervised 50 employees throughout design and execution of electrical main intake construction projects.
  • Monitor design process, installation and testing on electrical systems.
  • Altered and modified electrical designs to meet requirements and eliminate malfunctions.
  • Implemented safety and accident prevention programs for electrical main intake and chill water production plant.
  • Applied skills and understanding of engineering principles to lead implementation new equipments, tools and systems.
  • Drafted 2D designs, using both Visio and AutoCAD software.

Technical Director

ARES Energy Sdn Bhd
Cheras , Kuala Lumpur
2014.07 - 2020.02
  • Perform electrical energy isolation and restoration for installation up to 132kV in industry, power plant and commercial.
  • Lead shutdown works involving maintenance, calibration, repairing and upgrading of switchgears, transformers, capacitor banks, generators, protection relays, underground power cables, batteries, UPSs, and NERs.
  • Testing and commissioning of LSS in UiTM Gambang, LSS Bukit Selambau Kedah, LSS Sungai Siput and Biogas Malpom Nibong tebal.
  • Condition Based Monitoring (CBM) works for partial discharge detection onto step-up transformer in LSS at long-hours parking area KLIA Sepang.
  • Commissioning and power energization of UTM solar facility in UTM Jalan Semarak Kuala Lumpur.
  • Served as primary decision-maker for internal technology spending, creating budget guidelines to reduce waste and decrease unnecessary upgrades.
  • Founded interdisciplinary technology review protocols to smooth departmental upticks in spending by better aligning purchase efforts with company-wide goals.
  • Complied with stringent regulatory standards for electrical operation and maintenance, including testing and calibration.
  • Presented budget and business planning proposals to senior leadership, advocating for junior personnel needs and segment-wide business goals.
  • Managed implementation of new technological improvements resulting in increased efficiency of electrical installations
  • Collaborated with leadership staff to determine appropriate budgets.
  • Executed on senior leadership's long-term and mid-term renewable technology development goals.
  • Monitored production operations for quality and compliance with standards.
  • Assessed expected technical challenges and developed proactive solutions.
  • Recruited high-caliber development personnel, prioritizing candidates with history of helping employers execute business goals by exceeding expectations.
  • Developed suggestions for technical process improvements to optimize resources.
  • Analyzed project-related information and made recommendations based on discoveries.
  • Guided, coached and lead project teams, delegating tasks and evaluating performance and progression of project pace.
  • Applied advanced skills in ETAP and AutoCAD to produce protection relay coordination study and schematic drawings.
  • Supported creation of client and business partner relationships through careful collaboration and networking efforts.
  • Created internal product development roadmaps for technological solutions in power industry and renewable energy.
  • Authored wide-ranging roadmaps, determining how technology would be integrated into business operations for maximum return on investment (ROI).
  • Directed technological improvements, reducing waste and business bottlenecks.
  • Managed all aspects of technical and engineering division, including production, circulation, marketing, advertising and new product development.

Operation and Maintenance Senior Engineer

Lafarge Malaysia Berhad
Rawang , Selangor
2013.01 - 2014.04
  • Perform electrical energy isolation and restoration for installation up to 132kV in cement manufacturing plant.
  • Lead shutdown works involving maintenance, calibration, repairing and upgrading of switchgears, transformers, capacitor banks, generators, protection relays, underground power cables, batteries, UPSs, and NERs.
  • Lead the installation project of renewable energy project for solar energy facility integration in cement manufacturing plant.
  • Managed quality assurance program, including on-site evaluations, internal audits and customer surveys.
  • Performed duties in accordance with all applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Worked closely with Production Department to maintain optimum levels of communication to effectively and efficiently complete projects.
  • Completed predictive & preventative maintenance and electrical repairs on equipment.
  • Worked with Production and Engineering Department to understand needs and provide excellent service.
  • Improved power supply reliability through consistent hard work and dedication to Condition-Based Monitoring (CBM) program.
  • Resolved problems, improved operations and provided exceptional service to ensure electrical power supply in high state of reliability.
  • Created plans and communicated deadlines to ensure projects were completed on time.
  • Eliminated downtime and maximized revenue by providing top project quality control.
  • Managed team of 30 employees, overseeing hiring, training, and professional growth of employees.
  • Conducted research, gathered information from multiple sources and presented results.
  • Drove operational improvements which resulted in savings and improved profit margins.

Advanced Technical Service Engineer

3M Malaysia Sdn Bhd
Ara Damansara , Selangor
2011.09 - 2012.12
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Performed duties in accordance with all applicable standards, policies and regulatory guidelines to promote safe working environment.
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.
  • Drove operational improvements which resulted in savings and improved profit margins.
  • Led Electrical Market Division team in delivery of electrical product new and innovation project, resulting in winning tender bidding.
  • Handled day-to-day running of development of power cable accessories, ensuring high levels of productivity and progression.
  • Delivered exceptional level of service to each customer by listening to concerns and providing solutions.
  • Managed team of 10 employees, overseeing hiring, training, and professional growth of employees.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Led projects and analyzed data to identify opportunities for improvement.
  • Resolved problems, improved operations and provided exceptional service.

Operation and Maintenance Engineer

Tenaga Nasional Berhad
Petaling Jaya , Selangor
2006.12 - 2011.09
  • Perform electrical energy isolation and restoration for medium voltage in electrical main intake and chill water producing plant.
  • Lead shutdown works involving maintenance, calibration, repairing and upgrading of switchgears, transformers, capacitor banks, generators, protection relays, underground power cables, batteries, UPSs, and NERs.
  • Lead the introduction of renewable energy project for integration of solar energy facility into existing electricity power supply.
  • Completed daily, weekly and monthly checklists on 33kV electrical installations to maintain records of scheduled maintenance procedures.
  • Positively engaged with customers and maintained professional appearance at all times as company representative.
  • Installed, aligned and balanced new equipment while managing work of 25 employees.
  • Provided electrical facilities (Pencawang Pembahagian Utama TNB) inspection and maintenance to achieve superior levels of operation and reliability.
  • Examined alarm systems and monitors to meet carbon monoxide and fire standards and safeguard personnel.
  • Successfully alleviated breakdown issues by using firefighting troubleshooting method.
  • Safely and effectively handled wide range of testing and maintenance solutions.
  • Conducted repairs on 33kV switchgears and 33/11kV transformers, typically returning equipments and systems to functionality within declared time frame.
  • Continuously adhered to Malaysia regulations as well as detailed instructions, guidelines and specifications.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Completed electrical installation repair projects on time and under budget, resulting in 20% decrease in equipment breakdowns.
  • Maintained electrical installations functionality by repairing abnormalities and ageing issues.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Optimized work readiness with effective gathering of parts and supplies in alignment with specifications.
  • Supervised maintenance functions, working collaboratively with TNB Transmission division and Protection division.
  • Reduced opportunities for theft by securing all entrances and exits of electrical facilities (Pencawang Pembahagian Utama TNB)
  • Investigated and corrected electrical problems with CBM test set such as thermal imager camera, ultrasound scanner and transient earth voltage scanner.
  • Tested electrical continuity and insulation resistance by using multimeter, phasing stick and insulation resistance test set.
  • Conducted periodic visual inspections of 33kV switchgears and 33/11kV transformers to promptly identify issues that could cause installation malfunctions.
  • Created and followed detailed maintenance schedules for 33kV switchgears and 33/11kV transformers, resulting in 20% decrease in equipment failure or down time.
  • Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
  • Followed Safety Excellence Management System (SEMS) and international safety procedures to avoid injuries in field.
  • Executed tasks within time and budget constraints.

Mechanical, Electrical & Electronic Engineer

Projek Penyelenggaraan Lebuhraya (PROPEL) Berhad
Kuala Lumpur , Kuala Lumpur
2006.06 - 2006.11
  • Team member of project for solar facility installation at highway toll plaza.
  • Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
  • Administered both energized and de-energized testing on multi-design change packages.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Completed mechanical designs for HVAC, air control, fire protection and elevators while providing SME input to client and design teams.
  • Created electrical schematics using AutoCAD Electrical Toolset.
  • Created, aligned and optimized electrical instrumentation and testing equipment.
  • Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
  • Identified specific cables, connectors, fuses, circuit breakers and other electrical devices required for installation of monitoring systems and weapons detection systems.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Evaluated toll plaza electrical systems and components by designing and conducting research programs.
  • Supervised construction and pre-commissioning of electrical rooms, substations, and service buildings for toll plaza upgrade project.
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Developed energy saving initiatives for electrical products by studying customer requirements and proposing methods and materials.
  • Performed quality electrical drawing checks to confirm safe, compliant and cost-effective design criteria.
  • Designed utilities and ventilation systems for high technology facilities, including cleanrooms, general operation and maintenance facilities.
  • Identified root cause for electrical installation failures through design review and corrective action.
  • Mentored technician and new hire engineers to better improve competency and efficiency of all staff.
  • Reviewed project goals and objectives on monthly basis with project manager and design team.
  • Documented products and processes using Microsoft Office, Microsoft Visio and AutoCAD to document release notes and designs.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components and systems.
  • Spearheaded tendering and negotiation process for critical products and services to reduce costs and allow early contractor involvement.
  • Prepared technical documentation for operation, troubleshooting and maintenance of toll plaza and R&R facility.
  • Confirmed system and component capabilities by designing testing methods and testing properties.
  • Secured capital equipment for facility by developing RFQs and purchase requisitions.
  • Supported engineering design development through analysis and simulation of prototypes and 3D computer models.
  • Validated small product and subsystem performance by performing analysis, calculation and simulation.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Conferred with facility engineers to implement operating procedures, resolve system problems and provide technical information.
  • Determined most effective approaches to new projects by reading and analyzing blueprints, drawings and sketches.
  • Supported production cost quotations by providing estimates of equipment, material and labor costs.
  • Provided technical guidance, peer review and mentorship to technicians engaged in building system designs.
  • Communicated with engineers and customers to discuss potential and existing engineering projects.
  • Used Microsoft Excel formulae to calculate current loads and short circuit currents.
  • Performed analysis to evaluate power needs for various systems, including Low Voltage and Medium Voltage systems.
  • Developed and coordinated effective predictive, preventive and corrective maintenance approaches.
  • Prepared budgets by estimating materials, labor and construction costs.
  • Calculated energy savings to promote environmental sustainability and energy conservation to meet project requirements.
  • Forecasted estimates for project-related costs and provided general project task tracking for project milestones.
  • Conducted field surveys and studied maps and diagrams to identify and correct power system problems, including harmonics and maltripping problems.

Education

Master in Engineering - Power System Engineering

University of Malaya
Kuala Lumpur
2017.09 - 2020.09

Bachelor Degree in Engineering - Electrical Engineer (Power Industry)

University Technical Malaysia Melaka
Melaka
2002.05 - 2006.05

Matriculation Certificate - Health Science

University of Malaya
Kuala Lumpur
2001.01 - 2002.01

Skills

    Electrical components competency

undefined

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Certification

Competent Electrical Engineer 132kV

Quote

Genius is two percent inspiration, ninety-eight percent perspiration.
Thomas Edison

Timeline

Resident Engineer

Gas District Cooling Malaysia Sdn Bhd
2020.03 - Current

Master in Engineering - Power System Engineering

University of Malaya
2017.09 - 2020.09

Technical Director

ARES Energy Sdn Bhd
2014.07 - 2020.02

Operation and Maintenance Senior Engineer

Lafarge Malaysia Berhad
2013.01 - 2014.04

Advanced Technical Service Engineer

3M Malaysia Sdn Bhd
2011.09 - 2012.12

Operation and Maintenance Engineer

Tenaga Nasional Berhad
2006.12 - 2011.09

Mechanical, Electrical & Electronic Engineer

Projek Penyelenggaraan Lebuhraya (PROPEL) Berhad
2006.06 - 2006.11

Bachelor Degree in Engineering - Electrical Engineer (Power Industry)

University Technical Malaysia Melaka
2002.05 - 2006.05

Matriculation Certificate - Health Science

University of Malaya
2001.01 - 2002.01

Competent Electrical Engineer 132kV

Electrical Service Engineer 33kV

Registered Electrical Energy Manager

Professional Engineer with Practising Certificate (PEPC)

Professional Technologist

Corporate Member of Institute of Engineers, Malaysia

Ir. Ts. Ammar Bin AlamshahResident Engineer