Summary
Overview
Work History
Education
Skills
Personality
Icnumber
References
Personal Information
Accomplishments
Affiliations
Certification
Timeline
Generic
IR TS AHMAD MUZRI ABDULLAH SATAR

IR TS AHMAD MUZRI ABDULLAH SATAR

SENIOR MANAGER (CIVIL ENGINEER)
Cyberjaya,10

Summary

Ambitious, pro-active, independent, hardworking and dedicated. Able to deal with people and able to manage various conditions effectively. Enjoy taking on decision-making in various capacities and always ready to learn new things which related or not related with specific field of work.

Overview

2025
2025
years of professional experience
8
8
years of post-secondary education
2
2
Certifications

Work History

Senior Manager ( Civil Engineer ) – Head of Civil Engineering Unit

FGV Palm Industries Sdn . Bhd.
Kuala Lumpur , Kuala Lumpur
4 2007 - 11.2024

Company Overview: A Subsidiary Company Of FGV Holdings Berhad

  • Industry: Crude Palm Oil Production
  • In charge in the preparation of proposal report (feasibility study), tender document, technical specification, design work, cost estimation, calling of tender, evaluation of tender, project supervision and commissioning work (civil and M&E works)
  • Liaison with clients, contractors, suppliers, local authorities, surveyors, consultant and other professional personnel to execute various projects
  • The project involved are as follows: Construction of mill staff quarters (Baiduri type semi-d house and Ayu type bungalow house) at Kemahang, Keratong 2, Pasoh, Semenchu, Kulai, Padang Piol Selendang, Chini 2, Jengka 21, Jerangau Baru, Tementi, Bukit Kepayang, Bukit Besar, Chini 3 and Kota Gelanggi Palm Oil Mill
  • Construction of new Jengka 21 Palm Oil Mill (60TPH) in Pahang and Jerangau Baru Palm Oil Mill (30TPH) (supervision, evaluation of V.O, contract document for civil works only)
  • Upgrading existing pipelines (proposed 225mm OD PN 10.0 HDPE pipe) from raw water source to mill water treatment or storage pond for Kemahang, Tersang, Padang Piol, Selendang, Jengka 8, Serting, Kahang, Lok Heng, Penggeli and Selancar 2A Palm Oil Mill
  • Construction of intake works from raw water source to mill c/w inlet and discharge piping, valves, pump house (chamber and shed type), TNB supply, panels, switchboard and commissioning of centrifugal pumps at Jengka 8, Mempaga and Jengka 9 Palm Oil Mill
  • Construction of tube well works for quarters water supply c/w piping works, water storage tanks, treatment system, electrical works and commissioning works for centrifugal pump to elevated tank and submersible pumps at Aring A Palm Oil Mill, Gua Musang, Kelantan
  • Construction of slope remedial works at Panching and Kemasul Palm Oil Mill, Pahang Darul Makmur
  • Construction of 70 tons weighbridge c/w foundation works for Padang Piol, Kulai, Bukit Mendi, Selendang, Trolak, Keratong 2, Bukit Sagu, Chalok, Selancar 2A, Lancang Kemudi, Kembara Sakti and Sampadi Palm Oil Mill
  • Construction new office building for Kulai Palm Oil Mill
  • Construction of concrete roads for FPISB mills
  • Construction of continuous sterilization system for Kulai, Selancar 2A, Padang Piol, Nitar, Lok Heng, Bukit Kepayang and Keratong 2 Palm Oil Mill (survey, soil investigation, soil improvement, external works, foundation and structural works)
  • Construction of indexing system (compact modular concept) for Serting Hilir Palm Oil Mill (survey, soil investigation, soil improvement, external works, foundation and structural works)
  • Construction of apartment type staff quarters for Panching Palm Oil Mill, Kuantan Pahang Darul Makmur and Wilayah Sahabat, Lahad Datu, Sabah
  • A Subsidiary Company Of FGV Holdings Berhad
  • Industry: Crude Palm Oil Production
  • Specialization in: Design and selection of water supply pumps and piping, Design of reinforced concrete and steel works using selected civil engineering softwares (Esteem Plus)
  • 7.0, Microstran and Orion), Design of slope stability and soil improvement works, Design of piling depth and selection of pile, Taking off quantities, preparing estimates and tender documents

Civil & Structural Engineer

Perunding Makmur Consulting Engineers
Kuantan , Pahang
01.2002 - 04.2007
  • Company Overview: Industry: Consulting Engineering Works
  • Involve in designing of big scheme water supply system (consist of RC water storage tanks, piping for reticulation and bulk transfer, water treatment plant 25 million liter/day capacity, pump house and M&E works) at Pahang Tenggara area for JBA Pahang
  • Design of various structural works as follows: Sekolah Agama Rakyat Alor Akar, Pahang Darul Makmur, Sekolah Rendah Kebangsaan Bunut Rendang, Kuantan, Pahang, Kompleks Gerai Makan dan Terminal Bas di Cameron Highland, Pahang Darul Makmur, Lokap Berpusat di Bandar Indera Mahkota, Pahang Darul Makmur, Kompleks Perniagaan di Pulau Tioman, Housing projects, Buildings for Jabatan Pendidikan Negeri Pahang, Portal frame design for Kuantan Port Consortium warehouse
  • Road works and highway design for JKR KL and JKR Pahang
  • Bridge design c/w slope improvement works for JKR KL and Pahang
  • Design works for various telecommunications tower (4 legged tower, 3 legged tower, monopole tower and roof top tower) for CELCOM Pahang which consist of steel members design, connection design and foundation design mainly to counter uplifting force/reaction due to wind load
  • Liaison with clients, contractors, suppliers, local authorities, surveyors, consultant and other professional personnel to execute various projects
  • Evaluation of cost estimation, preparing of tender documents and technical specification
  • Industry: Consulting Engineering Works

Education

Bachelor of Science - Engineering (Civil)

University Technology Malaysia
Skudai Johor
01.1998 - 07.2002

SPM - Grade 1/ Aggregate 8

Maktab Rendah Sains MARA
Jasin, Melaka
01.1996 - 01.1997

PMR - 9A’s

Sek. Men. Abdul Rahman Talib
Kuantan, Pahang
01.1993 - 01.1995

Skills

Strategic Planning

Talent Development

Operations Management

Resource Allocation

Operations Planning

Cross-Functional Collaboration

Data Analytics

Market Analysis

Cross-Functional Communication

Personality

I am ambitious, pro-active, independent, hardworking and dedicated. I am able to deal with people and able to manage various conditions effectively. I also enjoy taking on decision-making in various capacities and always ready to learn new things which related or not related with my field of work.

Icnumber

800623-06-5317

References

  • Hambali Ahmad, General Manager, FGV Palm Industries Sdn Bhd, 013-7990119
  • Ir. Salimi Md. Saleh, Principal, Perunding Makmur Consulting Engineers, 013-3625912

Personal Information

  • Age: 37
  • Date of Birth: 06/23/80
  • Gender: Male
  • Nationality: Malaysia
  • Marital Status: Married

Accomplishments

  • Forecasted project costs for houses, urbanization and condominiums for a residential project composed of 200 houses.
  • Analyzed and interpreted government regulations impacting all mill staff quarters in Peninsular Malaysia, Sabah and Sarawak.
  • Trained and mentored 5 Civil Engineers over 10 years.
  • Established new preliminary analysis procedures for topographical and hydrological factors.
  • Managed 20 EIT I technicians and administrative staff on 100 projects.
  • 2-year volunteer mentor, American Society of Civil Engineers.
  • Completed civil engineering initiatives that included oil and gas pipeline engineering design.
  • Led a pre-cast segmental post-tensioned box girder bridge project.
  • Oversaw large-scale mixed-use, commercial, retail, industrial, institutional and residential development projects.
  • Built solid relationships with [Number] new clients, resulting in [Number]% increase in revenue.
  • Designed streets, storm drains, traffic signals, street lighting, traffic control devices and related municipal facilities.
  • Acted as Lead Design Engineer on multiple signing and pavement marking projects.
  • Supervised team of [Number] staff members.
  • Achieved [Result] through effectively helping with [Task].
  • Collaborated with team of [Number] in the development of [Project name].
  • Resolved product issue through consumer testing.
  • Achieved [Result] by introducing [Software] for [Type] tasks.
  • Documented and resolved [Issue] which led to [Results].
  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Achieved [Result] by completing [Task] with accuracy and efficiency.
  • Forecasted project costs for houses, urbanization and condominiums for a residential project composed of [Number] houses.
  • Analyzed and interpreted government regulations impacting [Describe area].
  • Trained and mentored [Number] Civil Engineers over [Number] years.
  • Managed [Number] EIT I technicians and administrative staff on [Number] projects.
  • [Number]-year volunteer mentor, American Society of Civil Engineers.

Affiliations

  • Project Management Institute
  • American Society of Safety Professionals

Certification

CPM - Certified Professional Manager

Timeline

Civil & Structural Engineer

Perunding Makmur Consulting Engineers
01.2002 - 04.2007

Bachelor of Science - Engineering (Civil)

University Technology Malaysia
01.1998 - 07.2002

SPM - Grade 1/ Aggregate 8

Maktab Rendah Sains MARA
01.1996 - 01.1997

PMR - 9A’s

Sek. Men. Abdul Rahman Talib
01.1993 - 01.1995

CPM - Certified Professional Manager

CM - Certified Manager Certification

Senior Manager ( Civil Engineer ) – Head of Civil Engineering Unit

FGV Palm Industries Sdn . Bhd.
4 2007 - 11.2024
IR TS AHMAD MUZRI ABDULLAH SATARSENIOR MANAGER (CIVIL ENGINEER)