Summary
Overview
Work History
Education
Skills
Extracurricular Achievement
Computer Skill
Language Skill
Transportation
Personal Information
References
Timeline
Generic
Hendri Bin Fauzam

Hendri Bin Fauzam

Kajang, Selangor

Summary

I am a very dedicated person, very committed on work and methodical individual. I have good interpersonal skills, am an excellent team worker and am keen and very willing to learn and develop new skills. Will using all the knowledge and skill experience to solve every problem and difficulty. What I am looking for now is a company where I can join a strong team and have a positive impact on improving myself to be better.

Overview

9
9
years of professional experience

Work History

Project Engineer

Kyudenko Malaysia Sdn Bhd
07.2018 - Current

Project: Nippon Express Malaysia New Warehouse,Selangor

  • Involved and assist in prepared Method of Statement,Catalogue and material.
  • To assist in design calculation for cable sizing and lux
  • Involved in prepared design and details drawing
  • Responsible to monitor subcontractor installation work, attend site progress meeting, coordination meeting and site inspection
  • Involved in Factory Acceptance Test (FAT) for switchgear, MSB and genset.
  • Responsible to do testing and commissioning report
  • Finish the defect and outstanding work.


Maintenance Work:

  • Preparing and checklist quotation for client.
  • Documented and developed engineering procedures and processes.
  • Managed budgets effectively for multiple projects, ensuring financial targets were met.
  • Negotiated contracts with suppliers to secure favorable terms, resulting in cost savings for the company.
  • Implemented strict safety protocols on job sites that reduced incidents significantly over time.
  • Ensured quality control for all aspects of the project, reducing defects and rework.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Developed detailed project plans to ensure timely completion and deliverables were met.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.

Assistant Engineer

MHPT Engineering Sdn Bhd (HITACHI)
03.2017 - 06.2018

Project: Build Assembly Factory UMW Toyota Project(Klang)

  • Involved in engineering work (electrical & mechanical) and design work
  • Responsible to monitor subcontractor installation work, attend site progress meeting, coordination meeting and site inspection
  • Involved in earthing system for grounding and lightning system
  • Involved in design Method installation for lighting, cable ladder, cable tray, trunking, GI conduit
  • Involved in Installation Transformer, MSB and Switchgear until energized.
  • Responsible to do testing and commissioning report.
  • Finish the defect and outstanding work
  • Involved in certificate of practical completion (CPC inspection) with main-contractor and client.

Maintenance & Customer Services

Song Box Entertainment Sdn Bhd
10.2016 - 03.2017
  • Repairing the damage cable
  • Checking system on CPU and monitor
  • Checking amplifier, speaker and microphone

Trainee Student

Saga Pertiwi Electrical Sdn Bhd
06.2015 - 09.2015
  • Wiring installation on the building
  • Maintenance and services bulb, capacitor and ballast
  • Operation underground cable for running electrical power.

Education

Bachelor Degree in Electrical Engineering

UNIVERSITI TUN HUSSEIN ONN MALAYSIA
10.2016

Electrical and Electronic Engineering

JOHOR MATRICULATION TECHNICAL COLLEGE
03.2012

Engineering

SEKOLAH MENENGAH KEBANGSAAN SERI SEMANTAN
12.2010

Skills

    Time management

    Research Expertise

    Computer skill

    Leadership Skill

Extracurricular Achievement

  • 2011/2012, Matriculation Curriculum Carnival-11 KPM, Top 10th Finalists (Volleyball)
  • 2011/2012, Invention Montage, 2nd Runner Up - Matriculation Level /2012
  • 2013/2014, University Sport Games (USG), 2nd Runner Up - University level / 2013
  • 2013/2014, Dean List Award, University level / 2013

Computer Skill

Sketch Up, Solid Work, AUTOCAD/ZwCad/Drafsight, DiaLux, Microsoft Office(Word, Excel and PowerPoint)

Language Skill

Very fluent in Bahasa Malaysia (written and spoken), Fluent in English (written and spoken)

Transportation

Yes

Personal Information

  • Available: One month
  • Age: 31 Years Old
  • Date of Birth: 29/01/1993
  • Gender: Male
  • Marital Status: Married

References

  • AHMAD BORHAN ABDUL MALIK,

     Branch Manager,

     Kyudenko Malaysia Sdn Bhd, 59-8, The Boulevard Office, Medan Syed 

     Putra Utara, Mid Valley City, Kuala Lumpur, 59200, +6011-27439554

     borhan@kyudenko.com.my

  • MUHYIDIN SUWONDO,

     Project Manager, 

     MHPT Engineering Sdn.Bhd, Lot 2.5.2, Level 2, PNB Perdana, No. 10, Jln Binjai, 

     Kuala Lumpur, Kuala Lumpur, 50450, +6012-9156758, 

     muhyidin@mhpt.com.my

Timeline

Project Engineer

Kyudenko Malaysia Sdn Bhd
07.2018 - Current

Assistant Engineer

MHPT Engineering Sdn Bhd (HITACHI)
03.2017 - 06.2018

Maintenance & Customer Services

Song Box Entertainment Sdn Bhd
10.2016 - 03.2017

Trainee Student

Saga Pertiwi Electrical Sdn Bhd
06.2015 - 09.2015

Bachelor Degree in Electrical Engineering

UNIVERSITI TUN HUSSEIN ONN MALAYSIA

Electrical and Electronic Engineering

JOHOR MATRICULATION TECHNICAL COLLEGE

Engineering

SEKOLAH MENENGAH KEBANGSAAN SERI SEMANTAN
Hendri Bin Fauzam