Summary
Overview
Work History
Education
Skills
Certification
Personal Strengths
Timeline
Generic
Hari  Krishnan Sani Raan

Hari Krishnan Sani Raan

QA/QC Manager

Summary

To advance in the field of Quality Assurance.

Experienced with managing quality assurance and quality control processes. Utilizes analytical skills to maintain compliance and improve efficiency. Track record of effective team leadership and problem-solving.

Professional with demonstrated expertise in quality assurance and quality control. Proven ability to lead teams, implement rigorous standards, and drive process improvements. Skilled in root cause analysis, regulatory compliance, and quality management systems. Adaptable and reliable, fostering collaborative environment to achieve outstanding results.

Overview

25
25
years of professional experience
14
14
Certifications
3
3
Languages

Work History

QAQC Manager

Principle Perspective Engineering Sdn Bhd
08.2018 - Current
  • Responsible for management and reporting on aspects related to Project Quality Assurance.
  • Preparation, review all project specification, PQP, Method Statement and ITP.
  • Liaison with Project Managers and departmental heads on the implementation of site quality management procedures.
  • Execution and evaluation project internal quality audit.
  • Confer with sub-contractors or design professionals to discuss and resolve matters of work procedures, complaints and construction problems.
  • Conduct pre-qualification inspection and approval of suppliers and sub-contractors.
  • Prepare and organise of sample submission and approval by Project Management team - Turner International.
  • Supervision of site engineers and sub-contractors and managing the installation of curtain walls unitised panels at site.
  • Periodic visit to Dong Guan, China, for inspection of Unitised Panels, Back Pans and delivery status to KL 118 Project site.
  • Incoming Inspection for delivery of curtain wall panels from China at allocated warehouse by Main Contractor - SUJV.
  • Inspection and coordination for NDE for fabricated Steel Embeds and brackets at local supplier's factory in the presence and witness by Main Contractor - SUJV.
  • Inspection of all installed Aluminium, Accessories, Gaskets are accordance with specified material.
  • Notification to Main Contractor - SUJV for Work Inspection Request and delivery of material handover to Project Site.
  • Coordination with Structural Steel Contractor - Eversendai Corporation for welding of facade steel brackets into the main column and structures at their premises.
  • Participate in weekly project progress status with other trade contractors involve with project KL118, chaired by Main Contractor - SUJV.
  • Identify and record any Non-conformance (NCR) relating to the production, installation process and damages in SAP system and follow up for closure of raised NCR's.
  • Document all QAQC reports from local and overseas suppliers and submission to Main Contractor - SUJV for recording and tractability.
  • Provided timely written reports of quality/regulatory compliance status to Project Director for QAQC activities.
  • Manage day to day operation of the quality department and perform other related duties that assigned by the Site Quality Manager and Regional Quality Director.

Site QAQC Engineer

Permasteelisa Group / Global Wall Malaysia
06.2017 - 07.2018
  • Project involved: PNB KL 118 - Heritage of Independence
  • Reviewed and approved engineering change requests, ensuring that modifications maintained product quality and conformed to project specifications.
  • Facilitated internal audits to assess compliance with company policies and procedures, uncovering areas for improvement and ensuring alignment across departments.
  • Improved product quality by implementing rigorous QAQC processes and procedures.
  • Conducted thorough inspections for adherence to project specifications, resulting in reduced defects and increased customer satisfaction.
  • Implemented changes to work instructions based on audit findings, enhancing overall system effectiveness.
  • Evaluated vendor capabilities during supplier selection processes, ensuring strong partnerships with high-quality providers.
  • Prepared, documented and executed detailed test plans, test cases and defect reports.
  • Reviewed and approved quality requirements for purchase orders and engineering specifications to meet contract compliance.

QA/QC Manager

Victor Buyck Steel Construction Sdn Bhd
03.2015 - 04.2017
  • Responsible for Quality function of the factory.
  • Ensuring organisational compliance with the required QA/QC Norms and Standards.
  • Ensuring projects involved are according QA/QC requirements.
  • Develope and maintaining project specific Inspection and Test Plans (ITP's)
  • Ensuring, review and understand customer specific requirements and apply into company system, procedure and documentation.
  • Ensuring of equipment and inspection tools are calibrated to ensuring product quality.
  • Witnessed needed tests on site and in the laboratory to ensure conformity of material and works according to the contract specifications.
  • Ensure that contractors comply with works and project specifications.
  • Managing group of Quality assurance staff in daily activities, coordinate and interface customer and supplier on quality related issues.
  • Monitor and coordinate QA activities from incoming, in process till finished goods achieve customer specified product quality.
  • Ensuring all quality information and Manufacturing Data Record (MDR) are published timely.
  • Responsible for customer complain and NCR's.
  • Planned and conducted Quality audits, as Lead Auditor for internal and external Audit.
  • Identified, documented and distributed audit observations and issued audit reports.
  • Reviewed & approved corrective action plans and tracked corrective action plans.
  • Provided timely written reports of quality/regulatory compliance status.
  • Act as Management Representative and Lead Auditor for Integrated Management System(IMS), ISO 14001, OHSAS 18001, Clause 4.2; MS 1722- 3.1.1, ISO 50001, ISO9001.
  • Performed Quality Audit training for internal Auditor.
  • Developed and revised QA Audit SOPs, compliance tracking tools and audit worksheets to improve processes and procedures in QMS and NIIX documentation management software.
  • Take charge and lead continual improvements activities.
  • Project involved: TGAST (Terengganu Gas Terminal-Fabrication of 2000t steel structure), SAMUR (Sabah Ammonia Urea Plant-Fabrication & Erection of 800t steel structure), PRASARANA (LRT ENVELOPE-Fabrication & Erection of 600t steel structure), TZM (Fabrication of 600t steel structure)

QA/QC Engineer

Boustead Atlashall
06.2014 - 02.2015
  • Project Involved Boustead Naval Shipyard - Lumut, Perak
  • Incharge of all stage of inspection and quality requirement as contract specification.
  • Develop written procedures for quality control/quality assurance;
  • Perform needed tests on site and in the laboratory to ensure conformity of material and works according to the contract specifications.
  • Witness / reviewed of PQR / WPS / WQT.
  • Liaise with NDT requirement according in specification.
  • Reporting and documentation.
  • Supervision on contractors to ensure fabrication work compile with contract specification
  • Witness of RFWI for each stage inspection of fabrication / painting / civil work / site erection.
  • Ensure that contractors comply with works’ specifications.
  • Establish and maintain procedures to develop standard documentation for construction works and quality control and assurance for the project.
  • Review the existing standard documentation for the Operations
  • Develop standard quality control procedures to be performed by the contractors.
  • Reporting of NCR activities

QA Engineer

EVERSENDAI ENGINEERING SDN.BHD
01.2012 - 02.2013
  • PROJECT INVOLVED: MANJUNG 1X1000MW COAL POWER STATION.
  • Developing and maintaining project specific Inspection and Test Plans (ITP’s): Compiling manufacturing records, ensure completeness and compliance with contract.
  • Responsibility for project reviews to identify project quality requirements
  • Attending project and supplier meetings
  • Reporting metrics and statistics on quality related issues such as CoPQ and NCRs
  • Reviewing all quality records for correctness and completeness and preparing End of Manufacturing Reports
  • Verify that all quality related activities are in accordance with codes and standards.
  • In preparation and qualification of new procedure, WPS, PQR and WQT

QC Inspector

Exxonmobil
01.2011 - 12.2011
  • Assist the QC in the inspection and testing requirements.
  • Inspection and audit in accordance with ITP which include witness, inspection and recording data and review of material.
  • In preparation and qualification of new procedure of WPS, PQR and WQT.
  • Coordinate with the contractor's representative on all quality matters.
  • Verify that the quality related activities are in accordance with the applicable codes and standards.

QC INSPECTOR-FLASH BUTT WELDING

EMRAIL / LEIGHTON
01.2010 - 01.2011
  • QC INSPECTOR FOR FLASH BUTT WELDING-MONITRING THE MACHINE PROCESS AND PRODUCTION OF FLASH BUTT WELD RAILS. (EDTP- ELECTRIFIED DOUBLE TRACK PROJECT)
  • MONITOR MACHINE BEHAVIOUR IN PRODUCTION AND TEST WELD THAT WILL BE SEND TO LAB (2 TIMES PER WEEK) FOR VARIOUS TYPE OF TESTING AS, SLOW BEND TEST, MACRO & MICRO TEST, SECTION CUT RESULT. (KTMB-RAIL INSPECTION REQUIREMENT FOR FLASH BUTT WELD)
  • MONITOR AND COORDINATE WITH 3RD PARTY UT INSPECTOR IN SITE/YARD FOR UT TESTING ON FLASH BUTT WELD RAILS THAT WAS WELD/JOINT TO BE A STRING CALLED LONG WELDED RAIL OF 150METER LENGTH WITH 5 FLASH BUTT WELD JOINTS.
  • UPDATE OF EVERYDAY PROCESS AND INSPECTION/TESTING RESULT.
  • WORK CLOSELY WITH CONSULTANT OF THE PROJECT.

QC Supervisor for NDT & Painting Inspection

BROMMA
05.2006 - 10.2010
  • Inspections on structural, shop fabrication, & Painting Inspection:
  • Lead inspection team to carry out and guide NDT team to perform MT, PT, UT (Thickness Gauging, Flaw Detection, A/B/C-Scan)
  • Attend meeting and liaise with Client representative with regard to work pack proposal, technical queries and inspection finding.
  • Performing welding inspection etc. visual and material inspection, witnessing preheat and post-heat prior and after welding process.
  • Preparing NDT Procedures, review complete NDT report and update NDT status.
  • Responsible to prepare preliminary and final report of inspection and maintenance carried out and Ordinary with codes, standards or client’s specifications for Inspection acceptance criteria.
  • Performing NDT works, NDT Procedures Preparation and other related processes.
  • Performing material identification and inspection works.
  • Surface preparation and coating inspection.
  • Visual body for mechanical damage (dents, cuts etc)
  • OD gage for wear
  • Ultrasonic Wall thickness measurements.
  • Inspection are dependent on the material for inspection and consist of MPI either by Wet fluorescent, Black/White contrast, Dry particle or Dye-Penetrant method to reveal discontinuities near or on the surface of Ferromagnetic metals.
  • Visual body for mechanical damage (dents, cuts etc)
  • Visual thread Inspection for nicks galls etc
  • Profile gage of rotary thread connections
  • MPI (or LPI) of body, blades or arms where applicable
  • Measurement and recording of dimensions
  • Painting Inspection includes blasting process to achieved surface preparation Sa 2.5
  • Dry Film Thickness measurement & Gloss inspection to make sure painting thickness & gloss meet with client’s spec of requirement.
  • Reporting and Documentation
  • Prepare material inspection report and material deficiency report if any.
  • Prepare material verification report, record heat number and mill certificate number and update to material traceability.
  • Prepare fit up and levelness/dimensional report prepared for visual inspection report.
  • Prepare NDT Procedures, review & update NDT reports.

Process Technician

Carsem Semiconductor
01.2002 - 04.2006
  • Work as a process technician.
  • Job description: Troubleshoot problem and search for the root cause. Familiar with wire bond machines (ESEC & KAIJO). Involve with maintenance and calibration of equipments and parameters.

Qc

System Protection & Maintenance
01.2001 - 12.2001
  • Project involve: 2100MW Coal Power Station Manjung, Sitiawan, Perak.
  • Work description:
  • Lead team of QC to carry out MPI & Dye Pan Inspection on Pipe joint.
  • Arrange qc inspectors for inspection required at site.
  • Generate Inspection Report & Documentation.

Education

Diploma - Engineering

Workers Institute of Technology
01.2000

Skills

Welding inspection

Certification

2007 - NDT course (UT, MT, PT)

Personal Strengths

  • Sense of responsibility
  • Creative and resourceful

Timeline

QAQC Manager

Principle Perspective Engineering Sdn Bhd
08.2018 - Current

Site QAQC Engineer

Permasteelisa Group / Global Wall Malaysia
06.2017 - 07.2018

QA/QC Manager

Victor Buyck Steel Construction Sdn Bhd
03.2015 - 04.2017

QA/QC Engineer

Boustead Atlashall
06.2014 - 02.2015

QA Engineer

EVERSENDAI ENGINEERING SDN.BHD
01.2012 - 02.2013

QC Inspector

Exxonmobil
01.2011 - 12.2011

QC INSPECTOR-FLASH BUTT WELDING

EMRAIL / LEIGHTON
01.2010 - 01.2011

QC Supervisor for NDT & Painting Inspection

BROMMA
05.2006 - 10.2010

Process Technician

Carsem Semiconductor
01.2002 - 04.2006

Qc

System Protection & Maintenance
01.2001 - 12.2001

Diploma - Engineering

Workers Institute of Technology
Hari Krishnan Sani RaanQA/QC Manager