1. Ensure to complete all task when started.
2. Work in team and guide new team member if have any issue.
3. Problem solving
4. Troubleshooting
5. Communication
Overview
12
12
years of professional experience
1
1
Certification
2
2
Languages
Work History
Senior Assembly and installation technician (Electrical)
Greatech Integration sdn. Bhd
05.2023 - Current
Complete electrical assembly, installation and testing of equipment to time deadlines
Assemble and integrate a variety of electrical assemblies
Obtain and verify kitted (pre-picked) details parts and assemblies were issued correctly by comparing part numbers and quantities to drawing
Follow oral/written instructions provided by the team leader, supervisor and/or engineering to complete assembly tasks
Ensure that parts issued are free of visible defects
Check work after completion of each operation in job or completed job to ensure assembly is complete per drawing, that there are no defects and that the work area is clean
Responsible to troubleshooting if any issue found from electrical site
Travel to customer sites and carry out installation, servicing work and training as scheduled
Able to work with minimal supervision
To comply to all requirements of ISO (inclusive of all standards approved by the Management) and to adhere to general safety practices, standard operating procedure, work instructions, policies and guidelines provided by the company
Maintain 5s all time at workstation area
Guide new team member if have any issue during assembly process
Discuss with superior or engineer if any isssue during process of assembly
Daily progress update to supervisor to trace workprogress until complete all task
Quality checking after complete assembly process (Pre FAT) based on drawing before pass to Quality Control department
Assembly Technician (Electrical)
Stratus Automation Sdn Bhd
11.2017 - 06.2022
Assemble Electrical component and wiring based on schematic diagram
Kitting part and sorting by module to ensure which priority first
Work in team to complete all task with time given by superior
Ensure to complete task before deadline assign by superior
Maintain 5s at workstation area
Discuss with superior and engineer if any issue found during assembly process
Quality checking based on schematic before pass to Quality department
Responsible to follow the project from start until packing
Assembly and Electrical Technician
Aczotech Malaysia Sdn. Bhd.
07.2017 - 11.2017
Assembly transport system conveyor and capping machine mechanical and electrical
Assemble the conveyor according to the drawings that have been set by engineer design
Assemble electrical circuit based on the circuit diagram
Test the machine in good condition in terms of quality and functional
SMT Technician equipment (Siplace SX-Series)
Plexus Manufacturing Sdn Bhd
03.2015 - 07.2017
Troubleshooting SMT machine error
Minimize throwrate of component during process
Conversion
Minimize downtime machine
Minimize reject rate to improve quality
Preventive maintenance and calibration
Support engineer to run NPI model
Create NPI program
Test NPI program until success
SMT Technician equipment (Siplace D-Series)
PAN International Electronics Sdn. Bhd.
01.2013 - 02.2015
Troubleshooting SMT machine error
Minimize throwrate of component during process
Conversion
Minimize downtime machine
Minimize reject rate to improve quality
Preventive maintenance and calibration
Support engineer to run NPI model
Create NPI program
Test NPI program until success
Education
Diploma of Electronics Technology - undefined
PUSAT LATIHAN TEKNOLOGI TINGGI (ADTEC) KULIM
Skills
Electronic Assembly
undefined
Certification
Malaysian Driving License Class B2 and D, 09/01/07, 09/01/25
Timeline
Senior Assembly and installation technician (Electrical)
Greatech Integration sdn. Bhd
05.2023 - Current
Assembly Technician (Electrical)
Stratus Automation Sdn Bhd
11.2017 - 06.2022
Assembly and Electrical Technician
Aczotech Malaysia Sdn. Bhd.
07.2017 - 11.2017
SMT Technician equipment (Siplace SX-Series)
Plexus Manufacturing Sdn Bhd
03.2015 - 07.2017
SMT Technician equipment (Siplace D-Series)
PAN International Electronics Sdn. Bhd.
01.2013 - 02.2015
Diploma of Electronics Technology - undefined
PUSAT LATIHAN TEKNOLOGI TINGGI (ADTEC) KULIM
Similar Profiles
Mohd Azhar Bin SaatMohd Azhar Bin Saat
Senior Application & Project Engineer at Bulk and Fluid Engineering Sdn BhdSenior Application & Project Engineer at Bulk and Fluid Engineering Sdn Bhd