Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Fazrul Rizal Riduan Bin Abd Rashid

Fazrul Rizal Riduan Bin Abd Rashid

Manager, Scaffolding

Summary

Dynamic and results-driven Manager with extensive experience at Malaysia Marine And Heavy Engineering. Proven track record in operations management and strategic planning, optimizing resource utilization to enhance productivity. Skilled in effective team management and quality compliance, successfully implementing ISO standards while mitigating risks to ensure project success.

Overview

16
16
years of professional experience
2
2
Certifications

Work History

Manager, Scaffolding

Malaysia Marine And Heavy Engineering
03.2022 - Current


  • Accomplished multiple tasks within established timeframes.
  • Manage and control the operation of Scaffolding for Yard Operations in ensuring productivity is aligned to projects delivery schedule, budget, HSE, quality and industry standards/regulations.
  • Manage and control the operation of department resources related to manpower, scaffolding material, relevant methods, and equipment to ensure that the resources are utilized at optimum level.
  • Manage and implement Quality Management system within department to ensure that it is fully implemented in compliance with ISO standard and industrial best practice.

Senior Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering
01.2020 - 02.2022
  • Responsible for overall planning, organizing, leading and allocation of department resources utilization, work schedule, procedure, and job execution to ensure to meet projects schedule, cost effectiveness, QHSE and compliance to statutory regulations.
  • Responsible for overall planning of production resources (manpower, equipment, material) for each project in Marine Operations by ensuring the utilization of resources are at optimum level.
  • Monitor and control the job execution progress according to the work instructions and procedures.
  • Identify training need for team and arrange/conduct training related to job function to enhance skill and proficiency.

Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering Sdn Bhd
08.2012 - 12.2019
  • Responsible for planning, organizing, leading and allocation of department resources utilization, work schedule,procedure, and job execution for assigned project to ensure to meet projects schedule, cost effectiveness, QHSE and compliance to statutory regulations.
  • Responsible for planning of production resources (manpower,equipment, material) for assigned multiple project in Marine Operations by ensuring the utilization of resources are at optimum level.
  • Monitor and control the enforcement of HSE in assigned projects are accordance to HSE rules and regulations
  • Mitigated potential risks by proactively addressing potential obstacles before they could impact project timelines.
  • Identify and request for subcontractors, in consultation with Project Manager and Production Manager and monitor the work execution after appointment of sub-contractors.
  • Involved and deliver successfully deliver with lot of vessels type for repair and conversion.

Site Manager, Scaffolding

Thysenkrupp Xervon (M) Sdn Bhd
09.2011 - 07.2012
  • Follow the risk assessment for projects and ensure legal requirement are observes at work site
  • ensure all work executed are within budget and schedule given.
  • Oversaw employee attendance record, handled payroll, claims.
  • Complied with safe operating practices and assessed operational procedures against best practices.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.

Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering Sdn Bhd
12.2008 - 06.2011
  • Responsible for planning, organizing, leading and allocation of department resources utilization, work schedule,procedure, and job execution for assigned project to ensure to meet projects schedule, cost effectiveness, QHSE and compliance to statutory regulations.
  • Responsible for planning of production resources (manpower,equipment, material) for assigned multiple project in Marine Operations by ensuring the utilization of resources are at optimum level.
  • Monitor and control the enforcement of HSE in assigned projects are accordance to HSE rules and regulations
  • Mitigated potential risks by proactively addressing potential obstacles before they could impact project timelines.
  • Identify and request for subcontractors, in consultation with Project Manager and Production Manager and monitor the work execution after appointment of sub-contractors.
  • Analyzed data trends to identify areas for improvement, developing targeted strategies for growth.

Education

Higher National Diploma - Electrical/Electronic Engineering

Institut Latihan Perindustrian Pasir Gudang (ILP)
Johor
04.2001 -

Skills

  • Effective team management
  • Operations management
  • Strategic planning
  • Decision-making
  • Performance management
  • Staff development
  • Financial management
  • Staff management

Certification

Advanced Scaffolding Competency (Reg. No. - JH/16/PP/03/0006)

Timeline

Manager, Scaffolding

Malaysia Marine And Heavy Engineering
03.2022 - Current

Senior Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering
01.2020 - 02.2022

AGTES (Reg. No. HQ/18/AGTES/01/02906)

11-2018

Advanced Scaffolding Competency (Reg. No. - JH/16/PP/03/0006)

11-2015

Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering Sdn Bhd
08.2012 - 12.2019

Site Manager, Scaffolding

Thysenkrupp Xervon (M) Sdn Bhd
09.2011 - 07.2012

Technical Executive, Scaffolding

Malaysia Marine And Heavy Engineering Sdn Bhd
12.2008 - 06.2011

Higher National Diploma - Electrical/Electronic Engineering

Institut Latihan Perindustrian Pasir Gudang (ILP)
04.2001 -
Fazrul Rizal Riduan Bin Abd RashidManager, Scaffolding