Summary
Overview
Work History
Education
Skills
Websites
Training
Accomplishments
Timeline
Work Availability
Work Preference
Software
Languages
Quote
Generic
Reynold Limbi Roland

Reynold Limbi Roland

Kuching,Sarawak

Summary

Analytical process engineer with a strong background in process optimization and problem-solving. Skilled in conducting thorough process audits to identify areas for improvement and implementing effective corrective actions. Recognized for consistently delivering measurable results and enhancing operational efficiency within collaborative team environments.

Overview

6
6
years of professional experience
3
3
years of post-secondary education

Work History

Process Engineer

Longi Malaysia Sdn Bhd
Bintulu, 13
06.2023 - 10.2024
  • Crystal Growth Specialist: Expertise in Czochralski method(CZ) crystal growth, optimizing processes to improve crystal quality (resistivity, lifetime, dead node, oxygen, and carbon content) and yield
  • Plant Startup: Led process optimization and troubleshooting for startup and commissioning phases, enhancing productivity and quality
  • Conducted root cause analysis to identify, prioritize and eliminate process losses, implementing solutions to prevent recurrence.
  • Incorporated statistical analysis and corrective actions to mitigate high-risk failure modes and enhance process reliability
  • Reduced production downtime by conducting thorough root cause analyses and implementing corrective actions.
  • Provided technical support for troubleshooting equipment issues, maintaining plant reliability and minimizing operational disruptions.
  • Provided technical assistance to production team when issues arose.
  • Reviewed processes, identifying areas requiring improvement.
  • Optimized manufacturing processes by implementing continuous improvement initiatives and lean methodologies.
  • Conducted root cause analyses for process failures, implementing solutions to prevent recurrence.

Maintenance Engineer (Contract)

Yujin Instec Co Ltd
Kuching, Sarawak
01.2021 - 05.2023
  • System Installation & Commissioning: Installed and commissioned advanced inspection systems utilizing camera alignment technology, ensuring precise integration with production lines
  • Preventive Maintenance: Conducted routine inspections and implemented preventive maintenance strategies to maximize equipment uptime and operational efficiency
  • Technical Issue Resolution: Diagnosed and resolved technical issues promptly, minimizing downtime and enhancing machine performance
  • Collaboration for Quality Control: Worked closely with production teams to ensure inspection systems met stringent quality standards, contributing to consistent product quality

Process Engineer

Longi Technology Malaysia Sdn Bhd
Kuching, 13
11.2018 - 11.2020
  • Plant Startup: Led process optimization and troubleshooting for startup and commissioning phases, enhancing productivity and qualityConducted root cause analysis to identify, prioritize and eliminate process losses.
  • Collaborated with cross-functional teams to improve product quality, resulting in increased customer satisfaction.
  • Designed and executed experiments to identify process improvements, leading to reduced costs and increased efficiency.
  • Reduced production downtime by conducting thorough root cause analyses and implementing corrective actions.
  • Provided technical support for troubleshooting equipment issues, maintaining plant reliability and minimizing operational disruptions.
  • Provided technical assistance to production team when issues arose.
  • Reviewed processes, identifying areas requiring improvement.
  • Optimized manufacturing processes by implementing continuous improvement initiatives and lean methodologies.
  • Identified bottlenecks in the production line through capacity analysis studies, increasing overall throughput rates as a result.
  • Designed and executed experiments to test process improvements, documenting results for future reference.
  • Conducted root cause analyses for process failures, implementing solutions to prevent recurrence.
  • Optimized production processes, resulting in increased efficiency and reduced waste.

Education

Bachelor Of Science - Industrial Chemistry

University Putra Malaysia
Seri Kembangan, 10
01.2013 - 01.2016

Skills

Teamwork

undefined

Training

  • 8-Disciplines Problem Solving (2023)
  • Statistical Process Control with Minitab
  • Poka Yoke
  • 7 Habits of Highly Effective People
  • FMEA
  • LEAN 6 Sigma

Accomplishments

    Bintulu Longi Ingot Plant Start-Up: Contributed to process engineering and operational readiness for startup and commissioning.

    QCC Project – Increased Pulling Speed: Boosted body pulling speed from 105 mm/hr. to 108 mm/hr. (approx. 2.86% increase).

    QCC Project – Reduced Ingot Head Oxygen: Lowered oxygen content in ingots from 15 ppm to 12 ppm (20% reduction), enhancing solar cell efficiency.

    Cell 2 Start-Up (Wet Bench Process): Supported start-up and commissioning for semiconductor manufacturing processes.

Timeline

Process Engineer

Longi Malaysia Sdn Bhd
06.2023 - 10.2024

Maintenance Engineer (Contract)

Yujin Instec Co Ltd
01.2021 - 05.2023

Process Engineer

Longi Technology Malaysia Sdn Bhd
11.2018 - 11.2020

Bachelor Of Science - Industrial Chemistry

University Putra Malaysia
01.2013 - 01.2016

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Work Preference

Work Type

Full TimeContract Work

Work Location

On-Site

Important To Me

Work-life balanceCompany CultureFlexible work hoursPaid sick leave4-day work weekHealthcare benefitsPaid time off

Software

Minitab

Languages

English
Upper intermediate (B2)
Malay
Upper intermediate (B2)

Quote

Imagination is everything. It is the preview of life’s coming attractions.
Albert Einstein
Reynold Limbi Roland