Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Achievement
Reference
Timeline
Generic
CHONG SOON YOONG

CHONG SOON YOONG

Engineer Mechanical
Klang Utama

Summary

Highly reliable and organized professional with a demonstrated aptitude for multitasking and a steadfastly positive outlook. Proactively seeks additional responsibilities to contribute to team goals. Detail-oriented team player with a proven ability to manage concurrent projects with precision. Accomplished in ensuring customer satisfaction, meeting stringent budgetary and scheduling parameters. Proficient in mechanical engineering design principles and adept at navigating relevant industry standards

Overview

8
8
years of professional experience
6
6
years of post-secondary education
6
6
Certifications

Work History

Mechanical Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
10.2020 - Current
  • Responsible for overall Maintenance and Engineering of Turbine Maintenance Section for Steam Turbine - .Rotating Equipment covers GF3 GE Steam Turbine 2X500 MW, GF2 and GF1 MHI Steam Turbine 4X 300MW
  • In charge of maintenance process for following Steam Turbine system as per procedure and guideline
  • Managed preventive maintenance, corrective maintenance, and continuous improvement projects for critical components including Condensate Water Pumps (CWP), Condensers, Boiler Feed Pumps (BFP), and Heaters, driving efficiency and longevity of plant operations.
  • Collaborate with Planning in reviewing planned outage inspection planned, work scope and commissioning program
  • To carry out preliminary troubleshooting and reporting for defective Steam Turbine equipment
  • Managed and actively participated in replacement of 2 X LP rotors for steam turbine reliability enhancement as part of GF3 project, ensuring seamless integration and performance optimization.

Shift Charge Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
02.2017 - 07.2020
  • Responsible for the operation on 2 x 300MW Oil & Gas fired Steam power plant operation including (isolation, normalization, synchronization, etc)
  • Write shift log and reports (UOIR, RCA)
  • Issue PTW ( Hot work , Confined space & Permit to test ).
  • To comply with any instructions and measures on Occupational Safety, Health and Environment by KEV or under OSHA (1994).
  • To develop and review policies, guidelines and standard operating procedure to enhance operational practices

Operation Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
03.2016 - 02.2017
  • Provide daily data and information in overall supervision of Operation section
  • Responsible in represent Operations in coordinating between Operations and Maintenance
  • Support shift operations team in carrying out unit troubleshooting and root cause analysis for unit major breakdown or critical issue
  • Lead , Monitor and follow up all commissioning activities.
  • Plan and execute budget and purchasing of CAPEX and OPEX for Operations unit
  • To review, revise and develop operation procedures.

Education

Bcahelor's Degree (Hons) in Mechanical Engineering -

UNIVERSITI MALAYSIA PERLIS
Kuala Perlis, 09
06.2011 - 06.2014

Diploma in Mechanical Engineering -

POLITEKNIK UNGKU OMAR
Ipoh, 08
05.2010 - 05.2011

Certificate in Mechanical Engineering -

POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH
Shah Alam, 10
05.2007 - 05.2009

Skills

Root Cause Analysis

undefined

Accomplishments

  • Certified Professional , Malaysia Board of Engineer , March 2024
  • Certified Professional , Malaysia Board of Technologies , May 2023
  • Certified, Authorized Entrant and Standby Person
  • Certified, Authorized Gas Tested by Dosh
  • Certified, Internal Combustion Engineer Grade 2, Nov 2019
  • Certified, Steam Engineer Grade 2, Oct 2021
  • Certified, Vibration Analysis Cat II, June 2023

Certification

GF1, GF2, GF3 Additional CWP Bearing Sealing Water Pipeline Project (Sep - Nov 2017)

Achievement

  • Unit 5 Force Outage Steam turbine overhaul (Nov 2021)
  • Successfully install & commission 2 new LP rotor of 500MW GE machine Unit 3 Minor Outage July 2022
  • Successfully upgrading of turbine control oil to turbine hydraulic power unit. Unit 5 Major Outage Steam turbine overhaul (Jan 2021)
  • Successfully replace & commission 2 set of LP L-0 blade for 500MW GE machine Unit 1 Major Outage (Feb 2017 & Nov 2016)
  • Lead commissioning program for U1 startup after come back from outage

Reference

IR. KOH CHIN LAI
Ex Chief Operating Officer
Operation & Maintenance Department
KAPAR ENERGY VENTURES SDN.BHD.
Sultan Salahuddin Abdul Aziz Power Station
Tel: +6019-220 3165


NOH AIDEAL BIN ABD SAMAD
Senior Engineer Turbine
KAPAR ENERGY VENTURES SDN.BHD.
Sultan Salahuddin Abdul Aziz Power Station
Tel: +6012-3815820

Timeline

Mechanical Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
10.2020 - Current

Shift Charge Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
02.2017 - 07.2020

Operation Engineer

KAPAR ENERGY VENTURES SDN.BHD. GENERATION DIVISION
03.2016 - 02.2017

Bcahelor's Degree (Hons) in Mechanical Engineering -

UNIVERSITI MALAYSIA PERLIS
06.2011 - 06.2014

Diploma in Mechanical Engineering -

POLITEKNIK UNGKU OMAR
05.2010 - 05.2011

Certificate in Mechanical Engineering -

POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH
05.2007 - 05.2009
CHONG SOON YOONGEngineer Mechanical