Summary
Overview
Work History
Education
Skills
LANGUAGES
Accomplishments
Quote
Software
Work Availability
Timeline
Generic
LAI CHEE KEAT

LAI CHEE KEAT

Technical Project Support

Summary

Experienced Technical Project Installation & Maintenance Manager and Senior Hardware Project Engineer with a strong background in technical project installation and management. Successfully executed Electronic Tolling System Projects in Malaysia, Thailand, and Indonesia. Demonstrated expertise in project systems installation, computer networking, CCTV systems, electronic tolling collection systems, and MLFF systems. Proficient in creating AutoCAD shop drawings and as-built drawings, designing electronic and electrical systems, troubleshooting, and installing various electronic product sensors. Committed to providing exceptional customer service while assisting in budget control for maintenance and project systems.

Overview

25
25
years of professional experience

Work History

TECHNICAL PROJECT INSTALLATION & MAINTENANCE MANAGER

Q-Free (Thailand) Co., Ltd.
07.2013 - 12.2024
  • Project Management: Led project teams to complete installations on time
  • Developed a prototype system to demonstrate innovative solutions
  • Installation and Testing: Oversaw the installation and testing of key systems, including Electronic Tolling Systems (ETC), MLFF, Networking, Electrical Power, Cabling, CCTV/ALPR Systems, and DSRC communication
  • Worked with various teams to ensure smooth integration and functionality
  • Safety and Reliability: Focused on safety and reliability during installations, following System Logic Design
  • Ensured proper Electrical Power, Networking, and Equipment Communication
  • Peripheral Devices and Troubleshooting: Designed peripheral devices like Controller Cabinets with DIO relays, IPC with Linux OS, and Networking Switches
  • Troubleshot device errors by checking connections, power supply, configuration settings, and communication ports
  • Documentation and Support: Created AutoCAD wiring diagrams, Shop Drawings, and As-Built Drawings for reference and customer and consultant submissions
  • Supported maintenance teams in both Corrective and Preventive Maintenance, ensuring optimal system performance and budget control

TECHNICAL MANAGER & HARDWARE PROJECT ENGINEER

Q-Free (Malaysia) Sdn. Bhd.
07.2003 - 07.2013
  • Project Management and Communication: Conducted project progress meetings with stakeholders, including customers, consultants, sub-contractors, and suppliers
  • Enhanced project completion rates through effective communication and collaboration
  • Team Leadership and Delegation: Planned and delegated tasks to team members, ensuring efficient project progress
  • Monitored project milestones and performance
  • Technical Training and Documentation: Trained the technical team based on project drawings and reports
  • Prepared essential documents, including Bill of Materials (BOM)/Bill of Quantities (BOQ), Quotations, and Internal Purchase Orders (IPO)
  • Relationship Building and Follow-Up: Maintained constant communication with the project team manager
  • Regularly followed up with suppliers and contractors to ensure timely task completion
  • Successful Installation: Ensured system equipment was installed successfully, achieving a high installation rate
  • Prepared efficient installation processes, minimizing project delays and costly modifications
  • Safety and Reliability: Developed procedures with a focus on safety, reliability, and efficiency
  • Installed and tested networking systems, ensuring seamless communication between Electronic Equipment Systems
  • Electrical & Electronic Expertise: Designed and tested electrical & electronic tasks related to voltages, currents, cable specifications & electronic equipment system
  • Supervised the project installation team, maintaining quality standards
  • Design and Documentation: Created AutoCAD wiring diagrams, Shop Drawings, and As-Built Drawings for project system equipment which served as references and delivered to customers and consultants
  • Built strong relationships with clients/customers

R & D ENGINEER

ACES Electronic Sdn. Bhd.
02.2000 - 02.2002
  • Circuit Design: Designed circuits using Protel software, ensuring optimal performance for electronic ballasts and lamps
  • Product Modelling: Utilizing AutoCAD software, created models for ballasts and lamps, emphasizing innovative design
  • Prototyping and Standards: Constructed new model prototypes, meticulously matching electronic component parameters to IEC standards
  • Checked and tested product electronic parameters, ensuring quality and reliability
  • Operational Efficiency: Actively contributed to enhancing production efficiency, ultimately boosting operational profitability

Education

Bachelor's Degree - Engineering: Electronic & Electrical Engineering, Major in Electronic Engineering

Sheffield Hallam University
04.2000 - 09.2000

Advance/Higher Diploma - Electronic & Electrical Engineering, Major in Electronic Engineering

Tunku Abdul Rahman College
10.1998 - 04.2000

Diploma of Higher Education - Electronic & Electrical Engineering, Major in Electronic Engineering

Tunku Abdul Rahman College
07.1996 - 10.1998

Certificate of Higher Education - Electronic Engineering

Tunku Abdul Rahman College
07.1994 - 07.1996

Skills

  • Customer Service & Preventive/Corrective maintenance
  • Team management & Task delegation
  • Vendor relationship management
  • Hiring and training
  • AutoCAD Project Shop Drawings & As-Build Drawings
  • Project Engineering Installation & Management
  • Installed, settings Networking & Surveillance Equipment: Lan Switches, Media Converter, Fiber Optic and UTP communication to server, CCTV, ALPR camera
  • Resource allocation
  • Technical Projects System hardware design
  • Computer Hardware Installation & Testing
  • Installation Windows/Linux OS Industrial PC
  • Analysed System Logs Logic & Data
  • Electrical/Electronic system Designed & Peripheral troubleshooting
  • Electronic and Electrical equipment function and connection with the IPC and DIO communication
  • Budget management
  • Quality assurance
  • Shift scheduling
  • Teamwork and collaboration
  • Operational efficiency
  • Cost control
  • Data analysis
  • System upgrades
  • Decision making
  • Technical documentation
  • Reports analysis
  • Spare parts inventory

LANGUAGES

English
Advanced
C1
Chinese (Mandarin)
Upper intermediate
B2
Chinese (Cantonese)
Proficient
C2
Malay
Upper intermediate
B2
Thai
Beginner
A1

Accomplishments

  • Completed and achievements of Projects as below:
  • The Cheras-Kajang Highway (Malaysia).
  • The East Coast Expressway (ECE) (Malaysia).
  • The KL-Karak Highway (KLK) (Malaysia).
  • The Highway of Southern Outer Bangkok Ring Road (SOBRR) (Thailand).
  • Upgraded of the Siri Rat Expressway (Thailand).
  • The Project in Jakarta (worked with Australia Project Team - Indonesia).
  • The Don Mueang Toll Way (Thailand).

Quote

Don’t fear failure. Not failure, but low aim, is the crime. In great attempts it is glorious even to fail.
Bruce Lee

Software

Autocad

Microsoft office

Winscp

Putty

Sketch up

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

TECHNICAL PROJECT INSTALLATION & MAINTENANCE MANAGER

Q-Free (Thailand) Co., Ltd.
07.2013 - 12.2024

TECHNICAL MANAGER & HARDWARE PROJECT ENGINEER

Q-Free (Malaysia) Sdn. Bhd.
07.2003 - 07.2013

Bachelor's Degree - Engineering: Electronic & Electrical Engineering, Major in Electronic Engineering

Sheffield Hallam University
04.2000 - 09.2000

R & D ENGINEER

ACES Electronic Sdn. Bhd.
02.2000 - 02.2002

Advance/Higher Diploma - Electronic & Electrical Engineering, Major in Electronic Engineering

Tunku Abdul Rahman College
10.1998 - 04.2000

Diploma of Higher Education - Electronic & Electrical Engineering, Major in Electronic Engineering

Tunku Abdul Rahman College
07.1996 - 10.1998

Certificate of Higher Education - Electronic Engineering

Tunku Abdul Rahman College
07.1994 - 07.1996
LAI CHEE KEATTechnical Project Support