Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Certification
Trekking
Timeline
Generic
Bryan Kallang Kuleh

Bryan Kallang Kuleh

Senior Mechanical Engineer
Bintulu, Sarawak,13

Summary

Accomplished Senior Executive and Engineer with a proven track record at Petronas LNG, Malaysia, adept in pump maintenance and cross-functional team coordination. Spearheaded major maintenance planning and safety initiatives, enhancing plant reliability and efficiency. Skilled in leveraging technical expertise and strategic planning to achieve operational excellence.

Overview

10
10
years of professional experience
4
4
Certifications
5
5
Languages

Work History

Senior Executive (Mechanical Maintenance Planner)

Petronas LNG, Malaysia
Bintulu, Sarawak
06.2024 - Current

Responsibilities

  • Review, analyze and consolidate work plans into an integrated overall work planning and scheduling for mechanical discipline in 3 modules and non-modular in Petronas LNG Complex inclusive of daily and short-term maintenance works and major maintenance activities in accordance with company's policies, procedures, and statutory requirements to ensure smooth plant production to meet the agreed targets.
  • Key Accountabilities
  • 1. Planning and Scheduling
  • Review and analyze of all the maintenance work request for Mechanical Train 9 and MLNG 3 activities including bad actors, SAP backlog and major maintenance works into comprehensive and integrated work schedule to contribute to achieve production capacity and plant reliability and availability.
  • 2. Coordination and Liaison
  • Coordinate and liaise with Operations, Area and Mechanical Managers, Engineers and Superintendents and contractors through regular coordination meeting with the respective parties to ensure work priorities, schedules, resources, work methodologies and equipment release and update/reschedule as a result of urgent/priority jobs.
  • 3. Documentation and Control
  • Prepare, Compile and develop complete documentation of shutdown work list, tow weeks Look Ahead Plan (LAP) and Long Term LAP (1 year) excluding Turnaround (TA) individual discipline maintenance work schedule including material & resource requirements, participate in all the work list review meetings with various project groups to ensure smooth implementation of activities.
  • 4. Budget Preparation and Monitoring
  • Prepare and compile maintenance budget, monitor and analyze expenditure and budget variance and present the monthly budget variance report for management update to ensure effective cost management and optimum utilization of resources.
  • 5. Plant Turnaround Preparation
  • Register defect work list that cannot be done online to Turnaround Engineering Department and discuss in the work scope challenge session to achieve plant reliability and availability.

Senior Mechanical Engineer

Petronas LNG, Malaysia
Bintulu, Sarawak
09.2021 - 05.2024

- Plan and execute routine maintenance program, including inspections, preventative, predicative and corrective maintenance for rotating and static equipments.
- Ensure all break-down maintenance is conducted within set time limits and to safety & quality standards.
- Familiar and knowledgeable in ASME PCC 1, PCC 2, ASME B31.3, API510, TEMA, API 614, API 610, API RP 687, API 697
- Provide the sites with engineering troubleshooting support either directly or by coordinating the input of engineering specialists
- Take part in procurement and contracting process of spares and consumables / repairs and services
- Monitor and verify work quality carried out by external contractors
- Focal for modular shutdowns and focal for gas turbine inspection (i.e. HGPI, Major Inspection GT Frame 7)

Executive (Safety)

Petronas LNG, Malaysia
Bintulu, Sarawak
12.2018 - 08.2021

- Developed and supported implementation of processes and procedures HSE documents (risk assessments, HSE plans, HSE procedures, etc).
- Followed up of contractors/subcontractors including mobilization/demobilization, post-work assessment and audits when needed.
- Facilitated with investigative causes of injuries, accidents, incidents, and near misses identifying preventive safety measures for incorporation into the safety program
- Planned and performed site visits, inspections, technical advice, data interpretation, analysis and mitigations (UAUC, Stop Work, ZeTo, etc.), training, and process improvement.
- Assisted with various tasks contributing to staff organization.
- Conducted and participated in internal (First Line Assurance, HSEMS, MCF), regulatory, and Group level audits and inspections.
- Responsible with the creation of HSE communications and promotions.
- Provided support to Business Unit and HSE Advisors in the rolling-out of Group HSE objectives and other initiatives.
- Provided cross-Business Unit support when needed.
- Focal for digital initiatives (XPRESS, Artificial Intelligence Security Camera (AISC), Drone Surveillance and Inspection)

Engineer (Commissioning/Completion)

Petra Resources Sdn Bhd
04.2016 - 11.2018

Project Involvement : Samarang Redevelopment Project Phase 2 Enhance Oil Recovery (EOR)
Project Type : EPCC
Client : PETRONAS
Project budget : ~$27 million (RM 110 million)

Responsibilities / Work Details:
-Focal person for commissioning onboard in the absence of lead commissioning engineer.
-Acted as focal point with construction disciplines for agreed completion status issues.
-Commissioned two 1000 kW Sulzer booster pumps on SUPG-B Platform for EOR Project.
-Participated in pre-commissioning stage for Solar Turbine Centaur 50 Gas Turbine Compressor
-Participated in pre-hydrotest and mechanical completion punch listing with construction field personnel.
-Prepared hydro/leak/service test package demarcation.
-Completed reinstatement and prepare systems and documentation for final handover to client at RFSU.
-With the discipline engineers and associated vendors, carry out functional tests of plant equipment and systems.
-Completed all associated commissioning documentation and check sheets.
-Familiar with project risk assessment activities such as HAZOP, CRA, PASR.
-Developed effective and presentable data monitoring of the construction documentation for the clients during daily progress meetings.
-Oversee completion of multi-discipline division of work related to pre-commissioning or commissioning on project.
-Maintained Project and Commissioning HSE standards within the allocated system work areas including all necessary tool box meetings with contractor’s personnel assigned to the commissioning team.
-Revised / Set up commissioning procedure and operation manual.

Process Engineer (Photolithography)

X-FAB
03.2015 - 03.2016

1.Supported in process startup, sustenance and improvement.
2.Monitored processes and ensure products quality is maintained.
3.New Process/Recipe set-up for new product development, process improvement and control.
4.Assisted senior engineer with the process of SWR / evaluation lot.
5.Monitored SPC performance and problem solving tasks.
6.Participated on yield improvement activities.
7.Participated and involve in projects (Cycle Time, Cost Reduction).

Maintenance Engineer

Toko Sdn Bhd
03.2015 - 04.2015

Performed maintenance for equipment producing electronic parts

Education

Bachelor of Engineering - Mechanical Engineering

Universiti Teknologi MARA
Shah Alam, Selangor, Malaysia
04.2001 -

Diploma - Mechanical Engineering

Universiti Teknologi MARA
Shah Alam, Selangor, Malaysia
04.2001 -

Skills

Pump Maintenance

Gas Turbine

Centrifugal Compressor

Static Unfired Equipment

Microsoft Office Apps

Cross-functional team coordination

Technical support

Strategic planning

Accomplishments

  • Successfully led the 2 Train 9 Main Machine Major Inspection for Gas Turbines and achieved mechanical completion ahead of schedule by 1 day without rework and HSE incident, resulted in restoring integrity of the equipment and achieved 1 kick start during startup.
  • Successfully led and coordinated 9P91503B the rectification works for the leaking bypass piping and 9P91503A mechanical seal replacement works and prevented flaring and potential production loss which estimated equivalent to 0.17 BCE/day.

Software

Microsoft Excel

Microsoft Work

Power BI

SAP

Microsoft Power Point

Certification

Mobius V-CAT1

Trekking

I enjoy trekking. Some of the famous places I have trekking to are Annapurna Base Camp (ABC) and Everest Base Camp (EBC)

Timeline

Senior Executive (Mechanical Maintenance Planner)

Petronas LNG, Malaysia
06.2024 - Current

Mobius V-CAT1

11-2022

John Crane Dry Gas Seal Training

11-2022

PADI Rescue Diver

03-2022

Senior Mechanical Engineer

Petronas LNG, Malaysia
09.2021 - 05.2024

BSI ISO 45001 Lead Auditor Training

11-2019

Executive (Safety)

Petronas LNG, Malaysia
12.2018 - 08.2021

Engineer (Commissioning/Completion)

Petra Resources Sdn Bhd
04.2016 - 11.2018

Process Engineer (Photolithography)

X-FAB
03.2015 - 03.2016

Maintenance Engineer

Toko Sdn Bhd
03.2015 - 04.2015

Bachelor of Engineering - Mechanical Engineering

Universiti Teknologi MARA
04.2001 -

Diploma - Mechanical Engineering

Universiti Teknologi MARA
04.2001 -
Bryan Kallang KulehSenior Mechanical Engineer