Adept Electrician with a proven track record at Canelect SDN BHD, showcasing expertise in electrical equipment maintenance and exceptional team collaboration. Achieved significant improvements in safety and efficiency, mentoring apprentices and leading by example in quality assurance and control circuit troubleshooting. Renowned for enhancing operational standards and electrical system reliability.
Control circuit troubleshooting
WORKSCOPE
- continue rejoint back cable at ladder side for MCC and MDB
- loop check for 6 set cable power due to missing marking
- Glanding and termination at MDB panel side
- Glanding and termination motor cable at MCC side
- dressing cable at Tray trunking and ladder side
- housekeeping inside the MCC room.
- reverse back fiber optic cable Rio panel
WORKSCOPE
- Isolate power supply
- Dismentle cable and breaker
- loopcheck and insulation test incoming n outgoing cable and busbar
- Cleaning sparking panel
- Wiring cable power
- Testing and calibration
- Power on switchgear, msb and breaker.
WORKSCOPE
- Continue laying power cable c/w earthing cable from MSB-3A to MSB-3.
- Cable stripping and cable lug installation for cabling to MSB-3A side.
- Termination work at MSB-3A busbar side.
- Modify existing trench cover as per designed cable routing and reinstall it back after cable laying work done.
WORKSCOPE
- Laid communication & signal cable from PMS room to ASI room
- fabrication support bracket of extension cable route
- dismantle routing trunking for 10nos pit pump motor due to construct new plinths motor.
- preparation for tomorrow planning laid power cable from DS07 to ASI room & DS02 to ASI room
WORKSCOPE
- Cabling works for Instruments at Condenser unit
- Installed support bracket and trunking.
- Laid cable for Pt100 and Control valve.
3-PHASE ELECTRIC MOTOR CONTROL BY GIATMARA MALAYSIA
3-PHASE ELECTRIC MOTOR CONTROL BY GIATMARA MALAYSIA
BASIC WIRING, DB INSTALLATION AND ELECTRICAL ACCESSORIES BY GIATMARA MALAYSIA