make sure all in cost budgeting and cost monitoring
less the defect
Engineering Practise
Overview
3
3
Certifications
22
22
years of professional experience
Work History
Project Manager
UMECH Construction Sdn Bhd
11.2022 - Current
Fully responsibility on site, manage daily
Involve in infra works to upgrade existing road under JKR project which is a total sub-project and lump sum which is a design and build. The project is including bridge flyover about 1km and earthwork about 3km with total coast value RM295 mil. My role in this project to report with management and advice the management about financial progress, physical including material planning. To ensure site in order and good condition and all team, subcontractor concern about safety public user. Monitoring work schedule and CPM. Monitoring all documents submission, including method of statement, Safety plan monitoring, environment plan monitoring, and Traffic management plant. To identify site concern and planning our works in design stage. To check and balance our financial schedule with physical schedule works. Advice to management about technical part. Liaise with JKR about the works progress, documentation. To present monthly works progress to JKR in monthly progress meeting every month. To ensure our evaluation claim with JKR is correct in JKR evaluation meeting. To ensure all staff play their role and achieve the target planning works with physical and financial progress.
Fully responsibility on site, manage daily work including material planning, to ensure site person follows the work program and sequence of drawing. Manage workers and find workers to finish the project. Assist QS for claim and to ensure get certificate in period time. To ensure in balance construction cost and total claim. Do planning budgeting on cost of material, machinery, labor and estimated time frame construction period. Estimate time frame construction period. Co-currently running 2 project, LRT3 masonry works at station 20 Kelang with coat project RM600k, and structure work for highway Dash CB2 package with cost project RM1.1mil.
Post position at project Dash highway with total cost project Rm425mil. My role at this project to assist my Section Manager and Senior Project Manager to handle and manage site issues such as a drawing, to solve site problems, manage machinery and equipment at site and assign daily work to my Engineer and supervisor. To ensure weekly target and monthly target by project planner were set target by Senior Project Manager. To get an achievement at the same time monitoring the cash flow progress claim. Monitoring and solve utility relocation work such as a TIME cable, 11KV electrical cable, 33KV electrical cable and raw water relocation before start physical works. Planning the progress precast product was needed to deliver at site for superstructure work such as a T-Beam, U-beam, and pier mold system and cross head mold system. Also ensure all equipment and drawing are ready at site such as a scaffolding work were use modular system. To monitor and ensure all staff dedicated such as engineer, supervisor and riggers team are follow their rule and follow our planning works. Liaise with consultant for progress work and sequence including method statement. Liaise with authority such as LLM for permit works, present the monthly site progress at site during site visit/inspection. Update and present monthly progress with consultant and client during monthly progress meeting.
Help project manager to manage and planning site daily work, solve the site problem from structure and architecture, Checking drawing ( Civil, Structure, Architecture,ID) and manage drawing for construction, daily report and monthly report, To arrange site supervisor at urgent work and give the idea how to do fast track, coordinate with sub-contractors from different trades, assist project manager to prepared material delivery schedule, planning daily usage plant and machinery such as backhoe, tower crane, mobile crane and etc, liaise with architect and consultants on technical matters and give advice for best solution, coordinate with M&E Staff for work associated with M&E works, Checking material requirement before start sub work and daily work.
Try to minimize double handling work and reduce time work. Evaluate wastage material and always alert company property, and propose alternative construction material and method for reduce construction cost. Give guide and train my subordinates. Experience in Qlassic, ISO 2001 and ISO 14001 and also Eimas training for competent Environment Controller.
Help project manager to manage and planning site daily work, solve the site problem from structure and architecture, Checking drawing ( Civil, Structure, Architecture,ID) and manage drawing for construction, daily report and monthly report, To arrange site supervisor at urgent work and give the idea how to do fast track, coordinate with sub-contractors from different trades, assist project manager to prepared material delivery schedule, planning daily usage plant and machinery such as backhoe, tower crane, mobile crane and etc, liaise with architect and consultants on technical matters and give advice for best solution, coordinate with M&E Staff for work associated with M&E works, Checking material requirement before start sub work and daily work.
Try to minimize double handling work and reduce time work. Evaluate wastage material and always alert company property, and propose alternative construction material and method for reduce construction cost. Give guide and train my subordinates. Experience in Qlassic, ISO 2001 and ISO 14001 and also Eimas training for competent Environment Controller.
Monitor and ensure quality of works in interior design like tilling work, Housing piping and housing defect. Assign as person in charge in project changing lamp at oil station pump and for cleaning work at plaza toll area.