Summary
Overview
Work History
Education
Skills
Significant Accomplishments
Personal Information
Projects Handled
Timeline
Generic
ARAVINDA SHENOY

ARAVINDA SHENOY

DGM Quality, R&D
Kuala Lumpur,14

Summary

An Electrical Engineering Graduate with over 19 years of experience in Quality,Operations and Maintenance, Resource Management, ERP SAP and Process Improvement Initiatives. Over 12 years of progressive responsibility managing QA/QC and R&D in copper tube manufacturing across continuous casting, drawing, annealing, and testing processes.

Experience in running R&D and QA programs in copper tube and alloy development Expertise in implementing ISO 9001:2015, AD 2000 PED Directives, BIS Product certification, GHG & Sustainability reports. As project engineer having experience of OFHC, copper wire drawing plant installation, Copper tube plant starting from Melting casting till Bright annealing furnace installation & commissioning, managing operations and quality.

Proficiency in devising quality plan, operation strategies, procedures and methods; diagnosing operational problems; monitoring and controlling costs. Leading audits, certifications, and cross-functional teams to meet quality objectives

Overview

19
19
years of professional experience
2006
2006
years of post-secondary education

Work History

Deputy General Manager (Quality, R&D)

METTUBE SDN BHD
Kuala Lumpur, Kuala Lumpur
01.2015 - 01.2025
  • Company Overview: Leading Copper Tube Manufacturer
  • In charge for the ISO 9001:2015 quality management system
  • Development of system documentation and records preparation to meet ISO 9001:2015, AD 2000, PED 2014/68/EU requirements.
  • New product development with its required documents like CP,FMEA,SPC, PPAP.
  • Conducting regular audits (Process & System audit) for supplier in a defined frequency
  • Find out the root cause for process problems by using QC tools like PDCA, 8D, Why-Why analysis, PSS etc
  • Conduct the process audit & Line walk audits at each stage.
  • Maintaining SPC for Critical Parameters of Components.
  • Customer Coordination and Handling Quality Issue
  • Develop and maintain Quality Assurance procedure and documentation.
  • Managed multiple projects simultaneously while maintaining focus on meeting key milestones.
  • Facilitated cross-functional collaboration to drive successful project completion within deadlines.
  • Increased customer satisfaction by addressing concerns promptly and implementing effective solutions.
  • Mitigated risks proactively by conducting thorough analyses of potential threats.

Associate Manager (Operations, Maintenance & Quality)

SIMS COPPER SDN BHD
Kuala Lumpur, Kuala Lumpur
05.2010 - 02.2012
  • Company Overview: Copper Wire and Busbar Manufacturer
  • Installation & commissioning of OFHC plant, Copper wire drawing plant.
  • Operations & Maintenance of OFHC, Wire drawing, conform & draw bench plant.
  • Handling Quality of finished products and to maintain quality standards.
  • Vendor management, Logistic coordination.
  • Supervising a team Maintenance Engineers and Technicians.
  • Copper Wire and Busbar Manufacturer

Associate Manager

Sterlite Industries (I) Ltd
06.2006 - 04.2010
  • Company Overview: Vedanta Group Company
  • Supervising a team Maintenance Engineers and Technicians.
  • Responsible for planning & execution of Capital Investment Projects.
  • To maintain availability of plant through Preventive Maintenance Schedules.

Education

B.E - Electrical & Electronics Engineering

University Visvesvaraya College of Engineering
Bangalore
03.2006

Skills

  • Eddy current testing

  • Control Plan

  • Corrective and Preventive Action

  • Cross Functional Skills

  • Customer Relationship Management

  • 8D problem solving

  • Internal Audit

  • Process Improvement

  • Process quality

  • Operations management

  • Cross-functional team coordination

  • Project management

  • Project planning

Quality management

Significant Accomplishments

  • Responsible for installation and commissioning of entire copper rod & wire plant.
  • Responsible for installation and commissioning of Bright annealing furnace for the copper tube plant.
  • Contributed to 40% prompt resolution of quality issues in production departments, resulting in improved product quality, and enhanced productivity, ultimately benefiting the business with cost savings and customer satisfaction.
  • Improved process Cpk from 1.2 to 1.5 through conducting studies, reducing defects by 15% and streamlined production by 15% through innovative way of automating processes.
  • Reduced recurring quality issues by 20% through comprehensive root cause analysis, leading to proposed process changes, increasing operating efficiencies by 15% and reducing bottlenecks.

Personal Information

Date of Birth: 12/01/84

Projects Handled

  • Installation and commissioning of Bright annealing furnace for copper tube, Project Manager, Part of core team member for the entire cast & Roll copper tube plant. Single handedly managed installation, commissioning and heat treatment cycle design for the bright annealing furnace.
  • Installation and commissioning of Eddy current system for copper tube plant, Project Manager, Eddy current and ultrasonic tube inspection systems. Reduced scrap across 3 tube-production lines by 12% through batch-level ECT standardization and frequency tuning.
  • Installation & commissioning of OFHC plant, Project Engineer, Installation & commissioning of oxygen free high conductivity 8mm to 12.5mm copper rod plant at SIMS Copper Sdn Bhd Malaysia.
  • Installation & commissioning of wire drawing plant, Project Engineer, Installing Rod breakdown, Intermediate & fine wire drawing plant with planning of pipelines, electrical connection, machine installation & commissioning & thereafter looking the operations, maintenance, cost control, resource planning etc at SIMS Copper Sdn Bhd Malaysia.

Timeline

Deputy General Manager (Quality, R&D)

METTUBE SDN BHD
01.2015 - 01.2025

Associate Manager (Operations, Maintenance & Quality)

SIMS COPPER SDN BHD
05.2010 - 02.2012

Associate Manager

Sterlite Industries (I) Ltd
06.2006 - 04.2010

B.E - Electrical & Electronics Engineering

University Visvesvaraya College of Engineering
ARAVINDA SHENOYDGM Quality, R&D