Anas Solihin Bin Mat Yunus is an experienced Automation and Utilities Manager with a strong background in electronic engineering. He has extensive expertise in managing ASRS systems, utilities, and facilities, ensuring smooth operations and minimal business interruptions. Anas excels in project management, preventive maintenance, and sustainability initiatives, contributing significantly to operational efficiency and CO2 reduction. He is proficient in various automation systems and committed to continuous improvement and professional growth.
Overview
24
24
years of professional experience
5
5
years of post-secondary education
Work History
ASRS & Utilities Manager
Coca Cola Bottlers (M) Sdn Bhd
Bandar Enstek, Negeri Sembilan
06.2020 - Current
Responsible and accountable on all utilities which includes Chiller, Air Compressor, Boiler, HVAC system, Cooling Towers, Fire Fighting system, maintenance of water treatment plant, waste water treatment plant, sewerage, High Voltage & Low voltage supply, Bomba Pump House, Water Tank and Building Maintenance
Manage all end to end maintenance program for ASRS system (and all subsystems) in order to ensure smooth operation, warehouse/logistics operation and no interruption to business
Accountable good support for production on utilities supplies in term of air, steam, water, electricity & gas
Carrying out of Predictive, Preventive maintenance & Breakdown maintenance, planning & execution Erection, commissioning and start-up of Capital projects / Plant modification jobs
Co-ordinate with plant & external agency for predictive, routine maintenance, preventive maintenance and shutdown maintenance in a planned manner & prioritization
Responsible for the Engineering Design, project specification, supplier selection, technical evaluation, negotiations together with Procurement for the tender Project
Evaluate bidder’s technical submittals, prepare recommendations, and respond to technical queries and clarification
Plan, schedule and monitor all work being performed by contractors and others within area of responsibility and perform quality assurance inspection on all completed jobs
Responsible for renewal of government license of the equipment under factory & machinery act
Responsible for DOSH, DOE, ST, KPDNKK, NIOSH, SEDA, GAS, IWK, TNB, BOMBA and authority on certificate application, inspection and relevant matters
Responsible for Utility Operations & Maintenance budget preparation, monitoring & control, expense record & downtime analysis, root cause failure analysis
Lead the team in Energy saving program & water resources management
To dealing with main utilities supplier such as SAINS, GAS & TNB
Involve in Energy Saving, Condensate Recovery, Solar System, High Efficiency Chiller, High Efficiency Boiler with Economizer, LED lighting, Inverter system and Pump Auto system
Managing the ASRS, Utilities & Facilities costing for OPEX & CAPEX
Overseeing the sustainability initiatives for the Company which include projects from Scope 1, Scope 2 and Scope 3 and leading the discussion on strategy paper on company decarbonization plan
Initiate, coordinate, and execute tailor-made initiatives that contributes to at least >8% CO2e reduction achievement for the company with reduction of 12k MTCO2e (2022)
ASRS Warehouse Technical Manager
Coca Cola Bottlers (M) Sdn Bhd
Bandar Enstek, Negeri Sembilan
01.2019 - 06.2020
Started up new Coca Cola ASRS fully automated warehouse with capacities 33,792 (phase1) and up to 85,000 pallet position
Manage all end to end maintenance program for ASRS system (and all subsystems) in order to ensure smooth project execution, warehouse/logistics operation and no interruption to business
Develop and implement effective and efficient standard engineering for ASRS system and its subsystems
Develop and execute test plans and test cases with a strong emphasis on using code to solve technical challenges
This includes estimating test effort, analyze and communicate test results and participate in day to day project execution and operational activities
Contribute to the building of a Continuous Integration environment and ongoing process improvement activities
Maintaining a high quality bar in a complex and constant evolving workspace
Accountable for automation and controls systems design, specification, programming, simulation and testing, and start-up assistance
While on Project Phase, lead team and going extra mile every day and pushing execution of ASRS readiness and contributed greatly to forward Go-Live of the first module by 3 months
Contributed and managing the overall impact less than 0.8% over the complete project value of RM65million (equipment cost)
Established and maintained relationships with external vendors for prompt restocking of needed items and supplies.
Automation Supervisor
F&N Dairies SDN BHD
Pulau Indah Klang, Selangor
03.2010 - 06.2017
Involve in F&N Dairies new Pulau Indah plant setup from Raw Material warehouse section, Processing and Filling Packing
Involve and perform 1st hand handling, maintain and troubleshooting Raw Material Warehouse that consist Automated Storage and Retrieval System (ASRS) from Daifuku– Malaysia biggest ASRS warehouse
Also perform installation and commissioning for KUKA palletizing robots, fine tuning position and create new product pattern for palletizing
Involve directly in Automation and Instrument installation, testing, commissioning and validation for all automation and instrument equipment ie Rockwell PLC which consist various type communication such as Device Net, Control Net, ProfiBus at FN Pulau Indah
Familiar with Allen Bradley communication, PLC’s (Micro Logic, Compact Logic), instruments such as Endress Hauser and IFM
Involve in updating and creating Wonder Ware Intouch programming
Responsible for arrangement technicians shift, liaise with contractor and vendors for various coordination jobs, planning preventive maintenance and ensure all issue arise with corrective action
Involve in daily plant troubleshooting and working close with team members to ensure less production interruption times
Managing crews of technician, wireman and fitters to ensure continuous support to production
Involve directly in Automation section requiring troubleshooting, upgrading, modifying and maintain instrument and automation equipments in order all the time
Also dealing with instruments troubleshooting using HART communicator SIEMENS
Keep on improving Daily Maintenance jobs, Preventive Maintenance by providing systematic arrangement involving parts, vendor support and realistic planning
Electronics Technician
NYLEX (M) BHD
Shah Alam, Selangor
10.2003 - 02.2010
Involve in daily troubleshooting and maintenance of all electronics instrumentation e.g
Level Switch, Temperature probe (RTD, PT100), Positioner, Temperature Sensor/Transmitter, Pressure Sensor/Transmitter, Load Cell, Metal Detector, Timer, Limit Switch, Flow Meter and Variable Speed Drives
Involve in troubleshooting and calibration of all electronics equipment such as Temperature Controller, Gap Controller, Load Cell, Auto Dosing system (SCADA), Master Reference Unit, Beta Ray and Corona Treatment Machine
Involve in installation and upgrading of electrical motor starter and Generator system
Involve in upgrading, installation and maintenance of AC and DC Drives either in single or gang mode
Installation of drives with speed control or tension control
Hands on troubleshooting, upgrading and maintenance of PLC system i.e Mitsubishi MelSec and Siemens S5
Involve in plant electrical utilities maintenance of all lightings, HVAC systems and hoist maintenance
Familiar with PABX and Dialer system
Troubleshooting and maintenance of electrical equipments including Distribution Board, Low Voltage Room, Air Compressor, Air Dryer Unit, Chiller Unit, Cooling Tower System, Hot Oil Burner and Boiler
Hands on repairing AC and DC motors, servicing and varnishing motor, checking (Megger) and testing
Troubleshooting faulty electrical and electronics equipments on all production machines
Monitored and tested equipment performance to diagnose and resolve problems.
Industrial Trainee
MALAYSIAN NEWSPRINT INDUSTRIES SDN BHD
Temerloh, Pahang
01.2001 - 05.2001
Involved in troubleshooting, calibration and maintenance of production machine
Involved in operation and maintenance of electrical equipment on the whole plant i.e 415 V MCC control system
Involved on upgrading and troubleshooting of various type of motor starter such as STAR-DELTA,DOL,Variable Speed Drive and Control motor
Motor overhaul, servicing and testing including changing bearings
Troubleshooting and maintenance of field instrumentation e.g Magnetic Flow meter, Flow Controller, Ultra Sonic Level Sensor/Transmitter, Turbidity Sensor/Transmitter, Pressure Sensor/Transmitter, Electro-Pneumatic Control Valve, Sensors, Positioners and Load Cell
Learnt and able to read P&ID Drawings, Loop Drawing and electrical schematics
Learnt to use DCS Version ABB AC 450 operator station in troubleshooting instrumentation problem
Helped in building up database for the plant Computerized Maintenance Management System (CMMS)
Education
High School Diploma -
Politeknik Shah Alam
Shah Alam
01.2000 - 06.2003
High School Diploma -
Sekolah Menengah Teknik Kuantan
Kuantan
01.1997 - 12.1998
Skills
Computer literate - MS Office 365 Pro Plus - Operating systems and networks : Windows 10 - Various CD/DVD software applications - Rockwell Allen Bradley PLC - WonderWare - HMI Intouch
Rockwell Allen Bradley Automation training at Bangkok, Thailand