BSP Facilities Rejuvenation Contract, CP07 Rejuvenation Phase 2 Project (Conceptual and Detailed Design) (June 2020 – June 2021)
- Collaborated with multi-disciplinary teams to solve complex engineering problems.
- Responsible for Pipeline/Pig trap System update scope, producing pig trap process design deliverables (datasheets, input to Mechanical Specification, Technical Bid Evaluations and Vendor Document Review) inclusive of Asset HAZOP Actions Close Out for Pipelines/ Pig Trap System.
- Responsible for Sump and Drain System updates (Additional isolation valves on drain line as per asset isolation philosophy, provision of level transmitters at sump caissons, Provision of new CPCB07 Open Drain Pumps to CPCA07 Sump) inclusive of Asset HAZOP Actions Close Out for Sump and Drain System.
- Responsible Platform Engineer for delivery of drawing package (PEFS, CEM, PFS and PSFS) for CPFB07 and CPPP07 for project including Key Document Approval (KDAs) with Technical Authorities.
- Produced Project HAZOP Close Out Report and individually accomplished the close out of more than 60 Asset HAZOP Close Out Actions (from a total of 350 Asset HAZOP Actions).
- Produced Project Addendum to CP07 Safeguarding Memorandum with input from all system engineers.
- Provided input to various deliverables such as Flare, Relief and Blowdown Report, Process Control and IPF Narrative, Process Simulation and Process Calculation Reports.
- Attended various workshops as part of project milestones such as Desktop Reviews, HAZOP, SIL Classification Workshop, Model Review, SDV & BDV Local Reset Rationalization Workshop, Valve Criticality Analysis, and Scope Segregation Workshops.
- Produced Vent System Adequacy Calculation using Unisim and Aspen Flare Analyzer (Flarenet)
- Produced Unisim Simulation for Fluid Properties Generation.
- Calculated Process Safety Time for Process Vessels on CPCX07
BSP Facilities Rejuvenation Contract, PID1270 Derating Project (Detailed Design) for Brunei Shell Petroleum (December 2018 – June 2020)
- Project Focal Point for Process engineering deliverables.
- Responsible for producing Weekly Progress Report for Process.
- Responsible for delivery of drawing package (PEFS, CEM, PFS, and PSFS) for PID 1270 Derating Project including Key Document Approval (KDAs) with Technical Authorities.
- Participated in PID 1270 Derating Project Desktop Technical Review, HAZOP/ Desktop Safety Review and IPF Workshops.
- Produced HAZOP/ DSR Close Out Report, Project Technical Queries and Line List.
- Support to IPF Close Out and Offshore Construction and Commissioning queries during Execute Phase.
- Provided process inputs to various mechanical and instrumentation deliverables (e.g. mechanical specification for pig trap, instrument datasheets, line list, pipe stress analysis)
BSP Facilities Rejuvenation Contract, Champion 11 (CPCX11) Rejuvenation Project (Conceptual and Detailed Design) for Brunei Shell Petroleum (July 2018 – June 2021)
- Focal Point responsible for interfacing and support to Third Party Consultants for delivery of Detailed Design Engineering Package
- Participated in various workshops during detailed design (DD) such as Model Review, mini-HAZOP workshop, KDA for DD Drawing Package (PEFS, CEM, PFS and PSFS) and Alarm Rationalization Workshop
- Focal Point for drawing package (PEFS, CEM, PFS and PSFS) for CPCX11 Rejuvenation Project including Key Document Approval (KDAs) with Technical Authorities.
- Participated in CPCX11 Rejuvenation Project Desktop Technical Review, HAZOP/Desktop Safety Review and IPF Workshops.
- Participated in Scope Prioritization Workshop, Scope Phasing Workshop and Constructability Review.
- Produced HAZOP/DSR Close Out Report
- Provided process inputs to various mechanical and instrumentation deliverables (e.g. mechanical specification for pig traps, instrument datasheets)
- BSP Facilities Rejuvenation Contract, Legacy/Asset HAZOP Close Out for Champion 11 (CPCX11) Rejuvenation Project for Brunei Shell Petroleum (September 2017 – April 2018)
- Produce HAZOP Close Out Report for Legacy HAZOP Workshop held every 5 years.
- Facilitated sign off for 60 HAZOP Close out sheets for HAZOP actions and recommendations encompassing entire Champion 11 Complex for various process systems.
BSP Facilities Rejuvenation Contract, Iron Duke (IDCX01) Rejuvenation Project for Brunei Shell Petroleum (August - December 2018)
- Hardware Barrier Assessment for Turnaround Readiness for IDCX01.
- BSP Facilities Rejuvenation Contract, Ampa 1 (AMRJ01) Rejuvenation Project for Brunei Shell Petroleum (July - August 2018)
- Hardware Barrier Assessment for Turnaround Readiness for AMRJ01.
- Support detailed design workshare office in KDA preparations.
BSP Facilities Rejuvenation Contract, Ampa 6 (AMCX06) Rejuvenation Project for Brunei Shell Petroleum (August 2017 – September 2017)
- Produced Pump & Line Sizing Calculations and Process Datasheet for AP06 Condensate Export Pumps.