Summary
Overview
Work History
Education
Skills
Professional Highlights
Projects
Personal Information
Affiliations
Certification
Hobby
References
Timeline
Generic
Allif Bin Tukiran

Allif Bin Tukiran

Project And Turnaround Engineer
Bandar, Selangor,10

Summary

Experienced A+ Project Engineer with a strong background in project construction, including 1.5 years of expertise in turnaround refinery plants and oil & gas downstream multi-discipline projects. Skilled in effectively managing MEP departments for high-rise construction projects. Demonstrated proficiency in project management, team management, document management, and sales marketing. Recognized for practical leadership abilities, fostering the growth and development of subordinates, and consistently delivering projects on time and within budget.

Overview

2025
2025
years of professional experience
2013
2013
years of post-secondary education
1
1
Certification
4
4
Languages

Work History

Project & Turnaround Engineer

Hengyuan Refining Company Berhad
2 2023 - Current
  • Major Turnaround (MTA) 2023: Coordinated work for Crude Distillation Unit 1 (CD1) and Flare Stack, managed 83 static equipment, 21 heat exchanger internal cleanings, 4 column internal cleanings, column tray replacements, critical tie-ins, furnace tube bank replacements, and flare stack main body and tip replacement projects
  • Texas Tower Combined Feed Exchanger E-451 Replacement: Co-reviewed JMS and JHA for E-451 replacement, coordinated critical lifting, and oversaw project commissioning
  • New Weighbridge Installation: Prepared scope of work for Proposal Fact Sheet, Technical Clarification, Technical Bid Evaluation, raise Purchase Requisition via SAP, Create Service Entry for payment purpose via SAP and oversee through the construction and commissioning of the project until handover
  • Flare Gas Recovery Unit EPC: Prepared detail scope of work, high-level timeline scheduling, tender clarification meetings, and design engineering modifications
  • HDS2 3rd Gas Compressor Retrofitting: Prepared project deliverables for Design Engineering, timeline scheduling, Technical Clarification, Technical Bid Evaluation, logistic and purchase requisitions using SAP, Create Service Entry for payment purpose via SAP
  • Air Separator Unit EPCC: Prepared detailed scope of work, high-level timeline scheduling, tender meetings, and issue of PR for the EPCC package
  • Standby Pump (Heavy Kero) P-153B, P-154B, P-157B and P-199B Installation: Prepared detailed scope of work for Design Engineering (Piping and Civil), Purchase of 2 No of OH3 Pump, Purchase of ROV, raise PR for construction, Design Engineering, Purchase Pump using SAP, prepare high-level timeline scheduling, tender briefing, technical clarification and technical bid evaluate and monitor progress of Design Engineering and act as document controller.
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
  • Presented technical findings to stakeholders, ensuring clear understanding of project status and goals.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Developed cost estimates and project specifications for proposals.
  • Requested budget approval from the Local Tender Panel and Regional Tender Panel.
  • optimized scope to reduce the project cost.
  • Negotiated with suppliers to secure high-quality materials at cost-effective prices.
  • Registered new equipment Preventive Maintenance Plan for project handover purpose as per recommended by vendor.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.

Assistant Manager M&E Department

China Communication Construction Company (M) Sdn Bhd
07.2021 - 11.2021
  • Managed high-rise residential projects, liaised with consultants, clients, and subcontractors, reviewed submissions and material compliance, and chaired subcontractor meetings for coordination and progress monitoring

M&E Coordinator

China Communication Construction Company (M) Sdn Bhd
6 2020 - 6 2021
  • Prepared M&E submissions, coordinated 3D Revit Models, presented progress to clients, and highlighted technical discrepancies through RFIs
  • Completed detailed inspections of electrical and mechanical components to identify issues.
  • Managed subcontractor relationships effectively to ensure timely delivery of services while maintaining high-quality standards throughout the construction process.
  • Ensured safety on job sites through strict adherence to regulations and implementation of hazard prevention measures during construction activities.
  • Enhanced building performance by troubleshooting and resolving complex MEP issues on-site during construction phases.
  • Collaborated with multi-disciplinary teams to achieve seamless integration of building systems while maintaining high aesthetic standards in architectural design elements.
  • Provided timely solutions to field conflicts arising from unforeseen site conditions or discrepancies in drawings by liaising with relevant parties involved in the project.
  • Offered technical support during bidding phases for accurate estimation of costs associated with mechanical, electrical, and plumbing installations across various projects.
  • Participated in regular progress meetings with stakeholders to keep them informed of project status, discuss any concerns or challenges encountered, and propose appropriate solutions.
  • Optimized energy efficiency in buildings through careful selection of equipment and materials based on life-cycle cost analyses.
  • Managed budgets effectively, ensuring optimal allocation of resources for successful project completion within financial constraints.
  • Developed comprehensive MEP specifications to guide construction teams in meeting project requirements accurately and consistently.
  • Conducted post-occupancy evaluations to assess system performance, identify areas for improvement, and implement necessary adjustments for ongoing optimization efforts.
  • Stayed abreast of industry advancements through continuous professional development, ensuring up-to-date knowledge on emerging technologies and design trends for application in future projects.
  • Streamlined MEP coordination processes for timely completion of projects by implementing efficient scheduling techniques and monitoring progress regularly.
  • Developed detail and compact inspection checklist through BIM360 template to streamline the usage of technology instead of paper checklist.
  • Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
  • Identified and resolved potential structural issues.
  • Estimated materials costs and sourcing requirements for project feasibility.
  • Acted as contact for client's communication with field personnel.
  • Displayed strong communication and interpersonal skills while visiting clients, jobsites and consultant offices to support project and business development needs.
  • Produced precise technical specifications and data sheets.
  • Ensured accurate representation of design intent, by developing and maintaining quality 3D models.
  • Facilitated cross-functional communication between architects, engineers, contractors, and other stakeholders to address issues promptly during construction projects.
  • Reduced clashes and conflicts in construction projects through comprehensive clash detection analysis.
  • Streamlined project delivery with effective management of BIM models and documentation.
  • Prepared, checked, and coordinated documentation to support component design and application.

M&E Coordinator

China Construction Development (M) Sdn Bhd
08.2018 - 11.2019
  • Managed high-rise and low-rise commercial projects, coordinated M&E works, reviewed material submissions, and liaised with authorities for compliance and project handover.

M&E Coordinator

Kerjaya Prospek (M) Sdn Bhd
06.2015 - 07.2018
  • Managed high-rise and low-rise residential and commercial projects, coordinated M&E works, reviewed material submissions, ensured compliance with GBI requirements, and liaised with authorities

Associate Planner

Pelabuhan Tanjung Pelepas Sdn Bhd
02.2014 - 05.2015
  • Participated in the Port Operation Planner Apprentice program, monitored container discharge operations, and planned daily operations to reduce loading times

Internship

STMicroelectronics Sdn Bhd
12.2011 - 02.2012
  • Reported to process engineers, prepared quality control reports, identified defect trends, and implemented preventive measures

Education

Bachelor's Degree - Mechanical Engineering

University of Sydney

GCE A-Level - undefined

MARA College Seremban

Sijil Pelajaran Malaysia (SPM) - undefined

MRSM Tun Ghafar Baba

Skills

Project Management

Professional Highlights

  • Delivered Major Turnaround 2023 for Hengyuan Refining Company Berhad Port Dickson as Area Coordinator with a contract sum of RM 110M., 03/2023
  • Completed Tribeca Suite Project (RM 152M) on time and received client incentives despite tight schedules and space constraints., 2019
  • Delivered Embassy Garden Sales Gallery 2 months ahead of schedule in 2019 with minimal manpower., 2019
  • Implemented BIM360 cloud document and project management system during the TRX Core Residence project., 2020
  • Negotiated with authorities to lower penalties due to employer non-compliance, minimizing employer losses., 2023

Projects

  • Standby Pump (Design Engineering, Purchase, construction and Installation), RM5,100,000
  • Major Turnaround 2023, Port Dickson, RM 110,000,000
  • E-451 Project 2023, Port Dickson, RM 22,137,500
  • HDS2 3rd Gas Compressor 2023-2024, Port Dickson, RM 5,000,000
  • Fuel Gas Recovery Unit Project 2023, Port Dickson, RM 30,000,000
  • Air Separator Unit Project 2023-2024, Port Dickson, RM 35,000,000
  • Weighing Bridge Installation 2023-2024, Port Dickson, RM 2,000,000
  • TRX Core Residence 2020-2021, Kuala Lumpur, RM 269,000,000
  • Agile Embassy Garden Sales Gallery 2019, Jalan Ampang, RM 10,000,000
  • MCL Wangsa Maju Sales Gallery 2018-2019, Wangsa Maju, RM 8,000,000
  • KL Eco City 2018-2019, Abdullah Hukum, RM 230,000,000
  • KYM Tower Mutiara Damansara 2017-2018, RM 77,000,000
  • BCB Home Tree 2017-2018, Kota Kemuning, RM 265,000,000
  • Tribeca Residence 2016-2017, Jalan Imbi, RM 152,000,000

Personal Information

  • Place of Birth: Johor
  • Hobbies: Running Half Marathons, Reading Books, Watching Movies and Tech Presentations
  • Nationality: Malaysian

Affiliations


  • Boards of Engineers Malaysia (BEM) - Mechanical Engineer Graduate
  • Malaysia Board of Technologists (MBOT) - Graduate technologist

Certification

Revit Essential Architecture, Structure and MEP

Hobby

Participate in Running Event Half Marathon, 10KM run and fun run.

References

  • Nadzri Manan, Project & Turnaround Manager, Hengyuan Refining Company Berhad, +6012-6080324, m.abd-manan@hrc.com.my
  • Muhd Arif bin Selamat, M&E Inspector of Work, LBS Bina Group Berhad, +6013-7947080, arifselamat84@gmail.com
  • Azizi Azuan, Sr M&E Coordinator, Kerjaya Prospek (M) Sdn Bhd, +6012-2059077

Timeline

Assistant Manager M&E Department

China Communication Construction Company (M) Sdn Bhd
07.2021 - 11.2021

M&E Coordinator

China Construction Development (M) Sdn Bhd
08.2018 - 11.2019

Revit Essential Architecture, Structure and MEP

05-2018

M&E Coordinator

Kerjaya Prospek (M) Sdn Bhd
06.2015 - 07.2018

Associate Planner

Pelabuhan Tanjung Pelepas Sdn Bhd
02.2014 - 05.2015

Internship

STMicroelectronics Sdn Bhd
12.2011 - 02.2012

GCE A-Level - undefined

MARA College Seremban

Sijil Pelajaran Malaysia (SPM) - undefined

MRSM Tun Ghafar Baba

Project & Turnaround Engineer

Hengyuan Refining Company Berhad
2 2023 - Current

M&E Coordinator

China Communication Construction Company (M) Sdn Bhd
6 2020 - 6 2021

Bachelor's Degree - Mechanical Engineering

University of Sydney
Allif Bin TukiranProject And Turnaround Engineer