Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic
Ahmad Fadhli Bin Abdul Rahman

Ahmad Fadhli Bin Abdul Rahman

Senior Project Engineer
Kuala Lumpur

Summary

Results-oriented Senior Project Engineer with 11 years of proven track record at Mass Rapid Transit Corporation, specializing in Project Management and Design Review for Signaling & Train Control System (S&TCS) and Automatic Platform Gate/Platform Screen Door (APG/PSD). Successful in determining project scope, creating project parameters, reviewing technical drawings and submissions to meet objectives and building project deadlines that lead to on-time completion. Proficient communicator in working with teammates to solve problems that arise during implementation.

Overview

13
13
years of professional experience
8
8
years of post-secondary education

Work History

Senior Project Engineer

Mass Rapid Transit Corporation Sdn Bhd
2023.09 - Current

MRT Putrajaya Line Defect Liability Period (DLP) and Asset & Operation Management

  • Lead efforts to oversee the System FRACAS (Failure Reporting, Analysis, and Corrective Action System) for S&TCS and APG/PSD, ensuring timely resolution of defects reported by operators and maintenance teams.
  • Coordinate and manage technical workshops focused on DLP activities and operational incidents, ensuring effective resolutions and improvements.
  • Conduct comprehensive asset performance audits in alignment with Integrated Management Systems (IMS) standards following ISO 9001, ISO 14001, and ISO 45001 guidelines, leveraging Internal Auditor training.
  • Utilize failure analysis techniques to identify root causes of signaling equipment failures and implement targeted corrective actions.
  • Collaborate with MRT Kajang Line (KGL) team to execute level 4 and 5 maintenance programs based on findings from failure analysis. Initiate Phase 1 of signaling recondition program to enhance asset performance, prolong equipment lifespan, and manage obsolescence effectively.

Senior Project Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2020.09 - 2023.08

MRT Putrajaya Line

  • Successfully delivered the Putrajaya Line Project within budgetary constraints. Managed and facilitated Pemeriksaaan Cermat Akhir (PCA) with APAD and led pre-handover activities to Operators for S&TCS and APG/PSD systems.
  • Supervised, reviewed, and approved design deliverables, specifications, and documentation throughout Concept Design, Preliminary Design, and Final Design Review phases for S&TCS and APG/PSD.
  • Provided technical expertise during installation and played a pivotal role in Testing & Commissioning (T&C) phases for S&TCS and APG&PSD. Ensured adherence to project standards and regulatory requirements while collaborating with diverse teams to integrate signaling designs with other railway systems.
  • Developed Trial Operation Test Cases and actively participated in Trial Operation Test Case Committee to ensure readiness and compliance with operational standards.
  • Managed relationships with Turnkey Contractors, Operators, and stakeholders by organizing and leading meetings and workshops. Ensured alignment on project milestones, facilitated progress, and addressed challenges proactively.

Project Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2016.10 - 2020.08

MRT Putrajaya Line

  • Supervised, reviewed, and approved design deliverables, specifications, and documentation for S&TCS and APG/PSD systems throughout Concept Design, Preliminary Design, and Final Design Review stages.
  • Provided hands-on technical support during installation phases and played a crucial role in the Testing & Commissioning (T&C) activities for S&TCS and APG&PSD systems, ensuring compliance with project standards and specifications.
  • Effectively liaised with Turnkey Contractors to ensure adherence to project schedules and milestones. Managed relationships with Contractors, Operators, and other stakeholders through proactive meetings and workshops, facilitating smooth project progression and timely completion of activities.
  • Provided technical expertise throughout all phases of project, ensuring accurate execution of designs and specifications.

Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2013.12 - 2016.04

MRT Kajang Line

  • Assisted Bombardier Testing and Commissioning (T&C) Manager with on-board signal equipment tasks, including writing method statements, hands-on installation, and Work Instruction creation.
  • Monitored quality issues, defects, and Non-Conformance Reports (NCRs), ensuring timely resolution and closure. Managed Signal Onboard Equipment Configuration Management and prepared documentation for static and dynamic T&C reports.
  • Conducted Electric Train testing and commissioning activities, including static and dynamic tests, troubleshooting, and closing T&C open points with the Project Delivery Partner (PDP).
  • Participated in Bombardier training sessions and contributed to project specifications, enhancing knowledge base and project efficiency.

Electrical Engineer

Shinryo Corporation (M) Sdn. Bhd (KLEC)
2012.01 - 2013.11
  • Designed and engineered District Cooling plants and cogeneration projects.
  • Prepared technical specifications and proposals.
  • Managed project feasibility studies and conducted tendering bids.

Education

Bachelor of Electrical Engineering - (Electrical – Control And Instrumentation)(Hons.)

Universiti Teknologi Malaysia
Skudai, Johor
2007.05 - 2011.12

Matriculation Certificate - Physical Sciences

Johor Matriculation College
Tangkak, Johor, Malaysia
2006.05 - 2007.05

Sijil Pelajaran Malaysia (SPM) -

Sek Men Teknik Tuanku Ja’afar
Seremban, Negeri Sembilan, Malaysia
2004.01 - 2005.12

Skills

    Site Management

    Project Management

    Design review

    Analyzing information

    System Engineering

Additional Information

  • Professional Technologist (MBOT)
  • Associate Member of IRSE (AMIRSE),
  • Graduate Engineer and Member of BEM.

Timeline

Senior Project Engineer

Mass Rapid Transit Corporation Sdn Bhd
2023.09 - Current

Senior Project Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2020.09 - 2023.08

Project Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2016.10 - 2020.08

Engineer – S&TCS, APG/PSD

Mass Rapid Transit Corporation Sdn Bhd
2013.12 - 2016.04

Electrical Engineer

Shinryo Corporation (M) Sdn. Bhd (KLEC)
2012.01 - 2013.11

Bachelor of Electrical Engineering - (Electrical – Control And Instrumentation)(Hons.)

Universiti Teknologi Malaysia
2007.05 - 2011.12

Matriculation Certificate - Physical Sciences

Johor Matriculation College
2006.05 - 2007.05

Sijil Pelajaran Malaysia (SPM) -

Sek Men Teknik Tuanku Ja’afar
2004.01 - 2005.12
Ahmad Fadhli Bin Abdul RahmanSenior Project Engineer