Full responsibility as Chargeman A1 with proven track record in supervising teams for breakdown and maintenance of low voltage overhead systems at TNB Klang Utara/Selatan and Kl Timur/Barat
To perform field service (Customer Site Services) activities involving the Switchgear,commisioning,maintenance,modification,and repair of complex Tamco Mv panel
Solve site problem at customer site and perform installation supervision of TAMCO product including day to day service of the same as per the direction of engineer
Overview
17
17
years of professional experience
5
5
Certifications
2
2
Languages
Work History
Chargeman A1
BGN TRADING SDN BHD
04.2024 - Current
Full responbility in supervising teams for breakdown and maintenance of low voltage systems SAVR( Sistem Atas Voltan Rendah) at TNB Klang Utara/Selatan and TNB Kl Timur/Barat.
Do new abc cable laying works for low voltage overhead systems
Pavement works for electricity supply to homes
Do installation blackbox for low voltage overhead systems
Senior Supervisor
TAMCO SWITCHGEAR (M) SDN BHD
01.2009 - 02.2024
Recond Breaker 33kV and 11kV included testing
Supervise installation work for panel 33kV and 11kV at TNB's site and Private Substation
Doing modification work for wiring and installation
Doing Gas Work for 33kV and 11kV panel type GV3, GV3N, and RMU Panel
Doing mechanical work for 33kV and 11kV mechanism
Doing breakdown or repair and flashover work for site TNB and Private Substation
Involve with Service Team and Project Team for site TNB and Private Substation installation, testing, modification, commissioning and maintenance
Chargeman A1 (Internship)
SPECO BUMI ELETRIK SDN BHD
07.2007 - 12.2007
Do wiring installation work for residential houses and bungalows phase one and phase three
1kW up to 20kW- Volt 415 motors plus direct line starters: Bintang Delta and Auto Tran's
Light points, fans, outlet sockets and with 60 amp main switch board (MSB), single phase and three phase
Installation of iron metal conduit/ PVC Mega Pipe, Trunking and Cable Tray for industrial wiring and others
Rewiring 100kVA Standby Power (Genset 100kVA) in the Bidor Toll Plaza area
Underground cable (Armoured cable) installation
Burial and insulation testing above the installation (Insulation Test and Earth Resistance)
Maintenance in the north-south highway area located from Bidor to Tanjung Malim
Fire alarm and fire prevention systems
Low voltage system (L.V room) 500 Amps Main Switch board (MSB) 415 Volts
Standby power system (Genset) 16 kVA to 100 kVA (Single Generator Powerhouse)
Feeder Pillar system and Street Lighting system
Highmast system as well with 400W flood light
Insulation test & earth resistance test
Wiring installation system single phase and three phase - Main Switchboard