Summary
Overview
Work History
Education
Software
Timeline
ProjectManager
Abdul Muhaimin Bin Abdul Razak

Abdul Muhaimin Bin Abdul Razak

Project Manager
Kajang, Selangor,10

Summary

Talented professional considered knowledgeable leader and dedicated problem solver. Brings 14 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements.

Overview

14
14
years of professional experience

Work History

Project Manager

Syarikat Tenaga Emas Jaya
06.2022 - Current
  • Planned, designed, and scheduled phases for small, middle and maintenance projects.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Identified plans and resources required to meet project goals and objectives.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Monitored progress, adjusting schedules and resources as needed to keep projects on track.

Project Engineer

IREKA Corporation Berhad
01.2020 - 06.2022
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Construct and planning all the installation activities.
  • Preparation of shop drawing and technical specification needs
  • Planning of monthly costing and budget for all the material and manpower.
  • Liaise with local authorities for the under ground services installation
  • Assist project manager and quantity surveyor for the progress report and claiming

M&E Coordinator

Acre Work Sdn Bhd
12.2018 - 01.2019
  • Evaluated the performance of subcontractors by conducting regular field visits, identifying areas requiring improvement or corrective action.
  • Implemented data quality assurance measures to ensure accuracy, reliability, and consistency of collected information.
  • Inspected and tested equipment, and all M&E components with consultant for the subcontractor work done .
  • Used (ACAD) software to create detailed drawings and schematics of mechanical and electrical systems.

Interface Supervisor

Ahmad Zaki Resources Berhad
09.2017 - 12.2018

AZRB has under its stable of engineering and construction in civil and structure also in machenical and electrical. They also conduct many mega project in malaysia such as highway, railway, high rise etc.

  • I am an interface supervisor assigned to prepare all drawings related to M & E architectural as well as maincon for KVMRT SSP LINE 2 package Station S206 project. interface department works as a way to avoid any overlap in installation work between all the services within the building.


  • I was also responsible for setting up 3D drawing using the autodesk revit which is its a new in the construction arena in malaysia and its used extensively in MRT line 2 projects and this system is called BIM's building information management

Clerk of Works

Apex Communications Sdn Bhd
08.2015 - 08.2017
  • Maintained detailed records of construction progress, including daily reports, photographs, and site meeting minutes.
  • Reduced delays by proactively addressing potential problems and resolving conflicts between stakeholders.
  • Improved construction quality by conducting regular site inspections and ensuring adherence to project specifications.
  • Provided valuable input during design phases to optimize constructability while adhering to client requirements.
  • Oversaw installation of critical building components such as communication systems, ensuring proper installation according to design specifications.
  • Collaborated with architects, engineers, and contractors for seamless project execution and timely completion.

Facility Team Leader

Texas Instruments
04.2013 - 08.2015
  • Reported building issues to building management to reduce safety concerns.
  • Set up and broke down meeting rooms for events.
  • Secured records and storage to comply with filing and indexing procedures.
  • Worked quickly on emergency requests in order to minimize disruptions to operations.
  • Responsible to checking all facilities equipment ( cooling tower, dust collector, air compressor, chiller and other ) run in normal condition
  • Responsible to do a corrective maintenance for all the equipment

Facility Technician

Daya Oci Sdn Bhd
10.2010 - 03.2013
  • Performed scheduled maintenance on electrical, plumbing, and HVAC systems.
  • Inspected buildings, grounds, and equipment for unsafe or malfunctioning conditions.
  • Enhanced facility efficiency by conducting regular maintenance checks and addressing issues promptly.
  • Served as a liaison between management teams and external contractors during construction projects.
  • Maintained a clean and organized work environment, adhering to company policies and industry standards.
  • Prepared documentation and drafted reports detailing completed maintenance activities and repairs.
  • Used standard housekeeping equipment, tools, and supplies to accomplish basic cleaning.

Education

High School Diploma -

Universiti Teknologi Malaysia
Kuala Lumpur, Malaysia
04.2001 -

Software

Microsoft Office

Microsoft Project

Autocad

Chief Architech

Timeline

Project Manager

Syarikat Tenaga Emas Jaya
06.2022 - Current

Project Engineer

IREKA Corporation Berhad
01.2020 - 06.2022

M&E Coordinator

Acre Work Sdn Bhd
12.2018 - 01.2019

Interface Supervisor

Ahmad Zaki Resources Berhad
09.2017 - 12.2018

Clerk of Works

Apex Communications Sdn Bhd
08.2015 - 08.2017

Facility Team Leader

Texas Instruments
04.2013 - 08.2015

Facility Technician

Daya Oci Sdn Bhd
10.2010 - 03.2013

High School Diploma -

Universiti Teknologi Malaysia
04.2001 -
Abdul Muhaimin Bin Abdul RazakProject Manager