Basf Gebeng Kuantan, Experienced more than 25 years and was assigned as a Welding, NDT, Piping Inspector, Third
Party Inspector, Client Inspector for Petronas Carigali, ExxonMobil, Bureau Veritas, Sarawak
Shell Berhad, Carigali Hess Operating Company,Sabah Shell Petroleum Company,Murphy Oil Corporation
and QA/QC Inspector, QA/QC Supervisor for main contractor in oil and gas industry upstream and
downstream activities, such as fabrications of topsides structure, substructure, jacket and pressure vessel tank
, onshore and offshore pipeline, FPSO,PLEM and riser installations and SCR(Stell Catenary Riser –for deep
water project(Gumusut Kakap Flowline/riser installation project), refinery, and gas processing plant,
power plant and major turnaround/shutdown
Jobs specification is to perform site quality activities in accordance with Project Quality Plan as per
ISO 9001 and worked with higher authority ie
Chief Inspector/Supervisor/Welding Engineer to
Address ITP Inspection Test Plan
Implement quality surveillance and inspection activities at
contractor and subcontractor sites
Keep Supervisor updated with activities and quality issues,
undertake stages inspections and monitor production progress .Review and evaluate contractors
record, completion files for accuracy and adequacy .Undertake inspection during manufacture and
constructions as ITP.Provide expertise to assist Engineer/Supervisor to avoid or resolve quality
Problems.Ensure that materials supplied meets the requirement of the specification
Witness /monitoring contractors activities and endorse contractors quality record as appropriate
and perform final quality check prior to loading/load out during shipment materials and equipment
Provide early warning of potential quality problems
Followed site safety rules and practice and
assist in safety campaign
Pipeline, Riser, substructure, and topside installations
Ensure all welding activities as per approval procedure and client specification
Conduct WQT/PQR
and reviewed WPS.Checked all incoming materials, consumables according to mill certificates
Verified pipe tally sheet against pipe loud out
Daily check on holding and baking electrode
Checked fit-up, visual and reviewed RT film, counter check on ultrasonic and other NDT method which is related to the jobs
And witnessed hydro test.Pre- commissioning activities flooding, pigging, hydro testing and dewatering
Record all activities prior to install jacket/module such as handling of barges and workboat, upending activities, divers and more on awareness of safety precautions
Witnessed and monitoring pile hammering, welding of jacket legs, conductors and transitions
Monitoring heavy lift of topside/module and prepared of schedule tasks for next activities
Record and submitted final document to CSR and solved any Non conformance report
Piping fabrication and HUC Commissioning works
Reviewed test package (test limit) ,do line check and punch list to ensure all equipment and instrument was installed
as per AFC drawing, including re issue by Eng .department as built drawing as per site installation
Witnessed
reinstatement test after completed hydro test to ensure all valve orientation, flow, direction and type of valve
are correct as per drawing
Also all permanent gasket was installed including bolting and witnessed hydro test
and leak test
Reviewed Rt films as part of piping NDT requirement and inspection
Turnaround and Shutdown
Carried out inspection on static equipment in various types of columns, pressure vessel, heat exchanger retubing,
underground tanks, flare stacks, heater unit, air fin cooler, boiler,lube oil cooler, piping and related equipment
Monitored welding, inspection, NDT activities and hydrostatic test, leak test, pneumatic test and monitored repair
progress on affected equipment until final inspection
Also carried out Key Performance Indicator (KPI) on external
static equipment and liaised with client
Coating /Painting Application
Surveillance, monitoring, witness and verification of all aspect of receiving bare pipe, internal and
External pipe coating work from pre-treatment, surface preparation, application, inspection, testing
Final Inspection, load out, reporting and documentation
Familiar with 3 and 4 coat system, 3LPP, 4LPP
Fusion Bonded Epoxy, Concrete Coating, PE etc
Field joint coating application ie
High Dense
Polyurethane Foam (HDPF), Asphalt Enamel and Heat Shrink Sleeve
Construction work task
Plan work activities and coordinate work permits preparation
Reviewed JSA/SSP with work force and ensure they are attached to the permit
Conduct and or attend tool box meeting and brief on any pontential hazards as required
Conduct additional works as per site inspection required
Supervised all the works activities
Participated in work planning and work permit coordination meeting with contractors
Ensure the controls restrictions,and precautions are maintained throughout the work activity
Ensure that work is confined within the work permit approved time frame
Evaluate specific safety requirement and instructions for the work activities in consultation with the operations by supervisor
Ensured that the site work carried out by contractor where in conformance to the relevant procedure project requirement,technical specification and good engineering practices and standards
To performe final inspection (Line checking) on process and utility piping to assure its compliance to iso matric,P@ID and generate punch list.
Llead
BASF Chemical( M ) Sdn.Bhd, Gebeng Kuantan
Qc supervisor for Welding / piping ,civil,structure and (JIT flange management)
Project :MOC (Modification of change) and upgrading plant.Aroma Infra,Acrylic 2EHA
Fabricate and installation of new piping CS/SS for new modification line
As per BASF schedule maintenance ,including civil work inspection as per Itp.
Welding / piping inspector
Testex (M) Sdn, ARKEMA Thiochemical ( M ) Sdn.Bhd
04.2020 - 10.2020
(JIT flange management)
Project : Fabrication and installation of new piping CS/SS,valve pump and other stucture skids for new modification line
As per schedule maintenance
RV inspector
TUV Bumitech Tech.Sdn.Bhd, Melaka Refinery Chemical Bhd
10.2019 - 11.2019
Project : Major TA Shutdown .
W.Il inspector
NDE, Bhd, OPTIMAL Chemical ( M ) Sdn.Bhd
09.2019 - 10.2019
Project : TA Shutdown at OPTIMAL plant Paka Kerteh.
Testex
(M) Sdn,Bhd
Civil and structural inspector
ARKEMA Thiochemical ( M ) Sdn.Bhd
07.2019 - 09.2019
Project : Fabricate and installation New Schedule Waste Storage
Construction supervisor
Hofinsoft Tech .Sdn.Bhd, Punj Llyod M.Sdn.Bhd
05.2018 - 04.2019
Heavy major maintenance (HMM)platform upgrading at Guntong A&,Palas –A (BROWNFIELD)
Company
Construction supervisor
RAPID Petronas Pengerang
04.2017 - 04.2018
Fabrication of 46 unit’s tank package for Petronas
Construction supervisor
SINOPEC Engineering Pte.Ltd, BASF Petronas Chemical Gebeng Kuantan
01.2017 - 02.2017
Fabrication of 7 unit’s tank package for HONEYDEW project at Gebeng Kuantan.
Technical inspector/ supervisor
MJ Inspection Consultancy, Turkmenistan, Turkmen Gas Pte.Ltd
06.2016 - 01.2017
(M) Sdn
Bhd
Seconded to TOYO Engineering, Ethane Gas Cracker PE&PP project at KNM Gebeng Kuantan
Code used : ASME V&IX and ASME B31.1
MJ Inspection Consultancy
(M) Sdn
Bhd.
Construction Supervisor
JGCS, Petrovietnam Pte.Ltd, Nghi Son
12.2014 - 02.2016
Refinery and Petrochemical Limited Liability Project-Hai Phong Hanoi,Vietnam
Code used : ASME /AWS D1.1 and ASME B31.1
Responsible for the supervision of construction and installation of carbon steel and stainless steel pipes
The work included installation of mechanical equipment’s fabrication and installation of connecting Carbon Steel and Stainless Steel pipework, installation of chemical dosing equipment and pipework, installation of pump stations, pressure testing
Ensure that method statements, risk assessments and job safety analysis has been undertaken and agreed prior to commencement of any new work activity if the activity has any potential to material or personnel
Ensure that all work is carried out in accordance with agreed method statements, risk assessments
and job safety analysis, ensure that the contractor maintains standards with in work areas
Attend contractors HSE Toolbox talks and safety meetings
Carryout witness, inspection and surveillance checks in accordance with Site Quality Plans
Ensured that the site work carried out by contractor where in conformance to the
relevant procedure project
requirement, technical specification and good engineering practices and standards
To performed final inspection (Line checking) on process and utility piping to assure its compliance
to ISO matric,P@ID and generate punch list.
Client rep
Velosi (M) Sdn. Bhd
03.2013 - 11.2014
Seconded to Murphy Oil Corp
Construction supervisor
Murphy Oil Corporation
Sarawak
Onshore Broke yard Eng.Sdn.Bhd
Project : EPCC of SOUTH ACIS-SAPA UTILITY and TOPSIDES Facilities and jacket
Senior Welding Inspector/Quality Control Subsea Inspector (Piping)
Onshore
Labuan Shipyard
Project : Transportation and Installation of Offshore Pipelines, Risers and Facilities for Gumusut-Kakap
Project.(Deep Water-Flow line Jumpers and Shipping Stand Fabrication) and
Double jointing pipeline for Gumusut Kakap peoject at Kuantan Port.(KPS)
1)12”-WIFJ-B-Water Injection Flow line jumper
2)10”-GIFJE-Gas Injection Flow line jumper
3)8”-PFJ-A1, A2, B1, B2 and C1, C2-Production Flow line jumper.-6 line spools
Code used: ASME /AWS D1.1 and API 1104,DEP..81.40.31-EPPScope
Company : Petronnic (M) Sdn
Bhd
Seconded to Exxon Mobil(M) Incorporated
Construction supervisor
Exxon Mobil (M) Incorporated, Champion
07.2010 - 12.2010
Pac Bintan
Project : 12”Pipeline CRA Replacement Project – Seligi to Semangkok and Riser Spool Fabrication at
Musthari yard KPK Kemaman
1)12” CRA Semangkok A –Semangkok B-2.96km
1)12” CRA Seligi C –Seligi A -5.76km
1)12” CRA Seligi D –Seligi F-4.5km
1)12” CRA Seligi D –Seligi A-3.82km
Code used : ASME and API 1104.
Sapura Acergy
Sdn
Bhd.
Welding Inspector/Quality Control Inspector
Nippon Steel Engineering Ptd.Ltd
05.2010 - 06.2010
Onboard Sapura 3000
Project : Iwaki (Esso) Decommisioning Project-Iwaki City Onahama Port Japan
Code used : ASME and API 1104
Scope of works
Removal of topside facilities and module support frame
Cutting jacket members and others frame structures
Lifting upper section of jacket and lowering to seabed
Cutting, plugging and stabilizing export pipelines.
Welding Inspector
Sapura Acergy(M) Sdn. Bhd, Sabah Shell Petroleum.Sdn.Bhd
02.2010 - 04.2010
Project :Gumusut Kakap Shallow Water
Code used : ASTM and NACE
Scope of works - (Load out pipeline pipes activity at PPSC Gebeng Kuantan
Project : Replacement New Piping-Cement line on oil rig (KSB-Kemaman
General Inspector, Client Rep
Carigali Hess Operating Co.Sdn.Bhd
10.1994
Onboard Castoro-8
Project : Bumi, Bulan&Suriya Gas Field Development.(JDA AREA)
1.) Installation of jacket and topside for Bumi-A, Bulan-A and Suriya-A Well Head Platform
2) Installation of CRA riser for Bumi-A, Bulan-A and Suriya-A (20” and 26” CRA pipeline)
Code used: ASME IX, ANSI 31.3, API 510 and API 1104., Welding Inspection (General) course at Ruane T.P O’Neill and qualified as Welding
Inspector CSWIP (3.1)
Global Industries Asia Pacific Pte.Ltd, National Petroleum Cooperation
01.2007 - 04.2007
Chevron Nigeria Limited/NNPC-Nigerian
Pipeline/piping supervisor
Intestmal Corp
07.2006 - 09.2006
Offshore pipeline, Riser and Deck installation-onboard Cheyenne barge
Project : Pipeline, riser installation and Meji Deck Installation at Okan Field, Nigeria
With various size of riser and pipeline from
1) 6”, 8”12”
2) 12”pipeline-18km
Code used: API 1104, AWS D1.1 and CHEVRON 20.02
Company
Structural Inspector
Sdn
09.1994
Project : New Warehouse Fabrication at Subang Perdana
Code used: ASME IX, AWS D1.1 and API 510, Qualified in ultrasonic in butt weld, plate, pipe and node joint at Ruane T.P O’Neill
Training Centre, UK
Static Equipment Inspector and Heat
Intestmal Corp. S/B, Vinyl Chloride Monomer, VCM, Sdn, Global Industries Asia Pacific Pte.Ltd
06.2006 - 07.2006
Oil Natural and Gas Corporation (ONGC) India, Limited
Project : Panyu@Huizhao Field Offshore Hong Kong- on board DLB Hercules
1) 20”pipeline-364km
2) 12”pipeline-1.8km
Code used: DNV OSF101/2000/SPC-SP-PL-010
Company:, Ultrasonic Pre-approval course at Ruane T.P O’Neill Training Centre
NDT Inspector
Petronas Carigali (M) S/B@PetroVietnam
03.1993
Project : Ruby Field Stage 1-Vietnam -on board DB 30 Mc Dermot
1) Jacket Installation RBDP-B
2) 10”-10KM Pipeline
Code used: ASMEIX, ASME B31.3, AWS D1.1, : In house training in MPI, UT and DPT in accordance to ASNT-TC-1A (1998) at
Client Representative, welding inspector
Bureau Veritas (M) Sdn.Bhd, Talisman (M) Limited
10.2004 - 12.2004
Project : 1) Fabrication of 2 units Strainer A/B-ST 5150 at Petra workshop KSB Phase 2, Kemaman
2) Reviewed RT film at Dialog E&C at Gebeng for gas metering station Petronas Gas Berhad
3) Conduct WQT/WPS Duplex SS for rejuvenation project at GPP 1 Paka, Kerteh
Code used: ASMEIX, ASME B31.3
Third Party Inspector
Bureau Veritas, Bhd, MTBE (M) Sdn.Bhd, Perindustrian Gebeng Kuantan
11.2004 - 01.2004
Project : Hot Tapping Project for 10 point on Air Fin Cooler System
Code used: ASME IX, AWS D1.1 and API 510
Company, TL Offshore Sdn.Bhd
Quality control supervisor
Exxon Mobil Esso Production Malaysia Inc
07.2004 - 09.2004
Pipeline
Project : Satellite Field Development III-Transportation and Installation Program 2004 -onboard DLB 264
Interplatform pipeline and structure
1) 6”Guf-Palas C (gas lift sub sea hot tap)-0.5km
2) 10” Guf-Palas A (FWS sub sea hot tap on existing 16”)-0.7km
3) 6&12”Irong Barat A-Irong Barat C (gas lift &FWS line)-3.7km
4) Tripod jacket structure Guf and Palas C
5) 16”FWS pipeline from Raya A-Seligi A-32km
Code used: API 5L ED 2000.API 1104, AWS D1.1and GS 18-7-3.
Qulity contol /piping Supervisor
Global Industries Asia Pacific Pte.Ltd, Sarawak Shell Berhad
02.2004 - 04.2004
Project : Serai to M3DRA (CRA Cladding) and Riser Installation- onboard DLB 332
1) Interplatform pipeline 18” from Serai Sub Sea well 1&2 to M3DRA -9.5km
L ED 2000.API 1104, Sea Survival Skills&HUET Training and Basic Fire Fighting at Marine Offshore
Static Equipment Inspector
Intestmal Corp.Sdn.Bhd, Sdn.Bhd
02.2003 - 04.2003
Optimal Turnaround/Shutdown.
Quality control /piping supervisor
OPI, Bhd, Talisman (M) Limited
05.2003 - 08.2003
(Oilfield Pipeline Inspection) Sdn
Project : PM3 Talisman CAA Development Project (Offshore pipeline Installation) -onboard DLB 332
1) Interpltform 6,10,20, &22”Bunga Raya A, B, C/ Bunga Seroja A, Bunga Kekwa A&C-7.4km
2) 6&10”pipeline to FSO/PLEM-4.7km
3) 10&14”pipeline piggy backed with 4”-7.4km
4) Riser fabrication and installation
Code used: BS 4515 ED 1996, API 5L ED 2000, Lundin Gen.B 908
In house training in Magnetic Particle Inspection, Radiography Interpretation and
Dye Penetrant Testing in accordance to ASNT-SNT-TC-1A at Crescent NDT&
Inspection Sdn.Bhd.conducted by MJ Consultancy Service Sdn.Bhd.
Practitioner
Intestmal Corp.Sdn.Bhd
05.1993
Ultrasonic Inspection, level 2 courses at SIRIM Shah Alam.
Ruane TATI
, Terengganu
10.1998
Petronas Carigali
05.2002
International (Thailand) Co.Ltd
03.2004
Certificate of H2S Awareness Training/Level 2, conducted by Marine &Offshore
International (Thailand) Co.
Education
Diploma - Science
MARA Institute of Technology
Computer Literate: Microsoft Windows
Professional Certificate
1) Authorized Gas Tester and Entry Supervisor for Confined Space - undefined