Summary
Overview
Work History
Education
Skills
Affiliations
Software
Certification
Timeline
Hi, I’m

Adam Ismail

Civil Engineer
Bandar Puncak Alam,10
Adam  Ismail

Summary

Results-driven Operations Manager with over 15 years of experience in project management, business development, and facilities management across multiple industries, including construction, engineering, and energy solutions. Proven ability to oversee multimillion-dollar projects, streamline operations, and implement strategic initiatives that drive company growth and operational excellence. Expertise in tender management, client relations, and stakeholder engagement, with a strong track record in revitalizing dormant companies, optimizing processes, and leading cross-functional teams to successful project completion. Adept at identifying growth opportunities and forging lasting partnerships, with a focus on energy-efficient solutions and sustainable practices.

Overview

18
years of professional experience
5
Certifications
2
Languages

Work History

PI Brilliant Berhad
Damansara, Selangor

Operation Manager
01.2019 - 09.2023

Job overview

Professional Summary Professional Experience Operations Manager | PI Brilliant Berhad

(Seconded to Excelon Sdn Bhd)
2019 – 2023

  • Oversaw daily operations, ensuring cost-effective and efficient processes.
  • Spearheaded business development initiatives, including identifying potential clients and partners.
  • Managed tender preparation, documentation, pricing, and negotiations.
  • Conducted field assessments, attended high-level meetings, and represented the company in seminars (e.g., CIDB).
  • Successfully revitalized Excelon Sdn Bhd, transforming it from a dormant entity into a thriving facilities management company.

Key Projects:

  • Operations Management: Streamlining processes, cost optimization, and performance improvement.
  • Project Management: Leading end-to-end execution of complex projects.
  • Business Development: Identifying growth opportunities and forging strategic partnerships.
  • Tender & Proposal Management: Preparing detailed documentation and pricing strategies.
  • Energy Solutions: Implementing energy-efficient systems and performance contracts.
  • Stakeholder Engagement: Representing organizations in negotiations and high-level meetings.

Destini Berhad

Resident Engineer
11.2016 - 12.2018

Job overview

Key Responsibilities:

  • Coordinated with authorities, consultants, and subcontractors to ensure project alignment and compliance.
  • Reviewed and verified daily, weekly, and monthly progress reports submitted by subcontractors and supervisors.
  • Assessed subcontractor claims, conducted joint evaluations with clients, and ensured accuracy in billing.
  • Attended and facilitated meetings with clients, subcontractors, and authorities to resolve issues and maintain project progress.
  • Identified and resolved discrepancies in construction and architectural drawings to prevent delays and rework.
  • Reviewed and approved Request for Inspection Forms (RFI) prior to subcontractors initiating tasks.
  • Monitored progress to ensure subcontractors adhered to deadlines and project schedules.

Project Background:
PPR Rembau Development Project – MYR 75 million
A government-funded design-and-build initiative for KPKT, focusing on developing a sustainable, full-scale community. The project included the construction of 452 housing units, community amenities, and infrastructure work, utilizing Industrialized Building System (IBS) and raft foundation techniques.


Highlights:

  • Managed earthworks for a 40-acre site, including land cutting and filling.
  • Supervised the construction of 452 housing units with accompanying facilities such as a community hall, mosque, kindergarten, shop lots, sewage treatment plant (STP), and complete infrastructure.
  • Ensured compliance with government requirements through the implementation of IBS technology.

LBS Berhad

Resident Engineer
06.2015 - 11.2016

Job overview

Key Responsibilities:

  • Conducted field quality control observations and assessments to ensure project integrity.
  • Inspected and evaluated construction materials for compliance with quality standards.
  • Monitored adherence to project specifications and industry standards.
  • Enforced compliance with safety regulations across all construction activities.
  • Assessed project feasibility and coordinated timely allocation of resources to the construction site.
  • Prepared detailed progress reports and assessments for each project phase, ensuring stakeholders were well-informed.

Project Highlight:
Midhill at Genting (MYR 320 Million)

  • Oversaw a mixed-use development project featuring hotel suites, penthouses, and retail apartments.
  • Managed construction activities for a project with an estimated gross development value of MYR 320 million.
  • Ensured seamless execution of a large-scale development aligning with the strategic vision of LBS Bina Group Berhad.

YNH Berhad

Project Engineer
02.2014 - 05.2015

Job overview

Responsibilities:

  • Conducted inspections of structural elements to ensure alignment with project plans and specifications.
  • Verified the dimensions and quality of rebar and formwork prior to construction activities.
  • Assessed leveling accuracy before concreting to maintain structural integrity.
  • Collaborated with signalmen, crane operators, rebar supervisors, formwork supervisors, concrete supervisors, and batching plant managers to ensure seamless execution of on-site work, including concreting processes.
  • Attended meetings with subcontractors, clients, consultants, and relevant authorities to address project updates and compliance requirements.
  • Prepared and issued Request for Inspection Forms (RFI) before commencing work phases.
  • Conducted joint inspections with the consultant’s clerk of works to ensure compliance with design standards and quality assurance.

Project Background:
Kiara 163 SOVO Development (MYR 240 Million)

  • A mixed-use development comprising Hotel Suites, SOVO (Small Office Virtual Office), and a retail podium.
  • The project utilized advanced construction methodologies, including bore piling with 1,288 piling points and the top-down construction method for substructure areas.
  • Implemented strategic slope and surrounding building protection during excavation, starting from LG2 to B2 levels.
  • Contributed to the successful progression of a high-profile development with an estimated gross development value of MYR 240 million.

T&T Pacific

Site Engineer
01.2012 - 01.2014

Job overview

Key Responsibilities:

  • Liaise with clients, consultants, and stakeholders to ensure project objectives are met.
  • Oversee the execution of the project in accordance with the established work program.
  • Ensure cost-effectiveness and adherence to the budget throughout the project lifecycle.
  • Prepare and submit detailed reports, including Daily, Weekly, and Monthly Site Reports.
  • Attend meetings with subcontractors, clients, consultants, and relevant authorities to discuss progress, challenges, and solutions.
  • Coordinate with subcontractors to ensure work is performed as per the project schedule and specifications.
  • Collaborate with the Project Manager to assist in creating and updating the Work Program using Microsoft Project.
  • Ensure strict compliance with Safety and Health regulations as part of the Safety and Health Committee.

Project Experience:

Jabatan Perkhidmatan Pembentungan (MYR 50 Million)
Upgrading 3 Sewage Treatment Plants under the GKL Package

  • Managed the upgrade of three Sewage Treatment Plants, transitioning from ODPS & EA systems to SBR tank systems.
  • Enhanced effluent quality from Category 3 Standard B to Category 1 Standard A.
  • Involved in the construction of key components, including:New SBR tanks
    New Chlorination tanks
    New Pump sumps
    New Blower houses
    New Drying beds

IJM Construction Sdn Bhd (MYR 2 Million)
New Sewage Treatment Plant Construction

  • Led the construction of a new Sewage Treatment Plant with a 5,000 PE capacity, ensuring all project milestones were met according to client and consultant specifications.
  • Managed the construction of similar components, with project-specific variations, including:SBR tanks
    Chlorination tanks
    Pump sumps
    Blower houses
    Drying beds

Malaysian Army

Army Officer
01.2006 - 11.2012

Job overview

  • Completed rigorous officer cadet training at the National Defense University, developing leadership, discipline, and decision-making skills under both mental and physical pressure.
  • Commissioned as an Army Captain, demonstrating exceptional capability in high-stakes environments that required rapid decision-making with no margin for error.
  • Honed a strong sense of punctuality, attention to detail, and a results-driven mindset, ensuring tasks were completed efficiently under challenging conditions.
  • Developed resilience, adaptability, and the ability to work in diverse and challenging environments, including high-stress, remote, and austere locations.
  • Emphasized continuous learning and quick adaptability, skills directly transferable to rapidly evolving industries, particularly in decision-making and problem-solving under pressure.




Education

NIOSH Malaysia
Bangi, Selangor, Malaysia

Some College (No Degree) from Safety And Health Officer Certificate
06-2013

UPNM
Kuala Lumpur, Malaysia

Bachelor of Science from Civil Engineering
04.2001

University Overview

Major in Project Management

Institut Kejuruteraan Medan (IKEM), Malaysian Army
Kluang, Johor, Malaysia

05-2012

University Overview

Combat Engineering
Project Management
Demolition
Chemical, Biological , Radiology and Nuclear warfare.

Skills

Decision-making

Affiliations

  • Kementerian Kemajuan Desa dan Wilayah
  • Kementerian Kesihatan Malaysia
  • Kementerian Dalam Negeri
  • Perbadanan Kemajuan Negeri Selangor
  • Perbadanan Kemajuan Negeri Perlis
  • Suruhanjaya Pilihan Raya Malaysia (SPR)
  • Jabatan Pengairan dan Saliran
  • UEM Edgenta
  • TNB

Software

AutoCad

Microsoft Project

Microsoft Office

Certification

Microsoft Project 2010 (Basic & Intermediate)

Timeline

Facilities Management ( SKP-F01)

06-2019

Operation Manager

PI Brilliant Berhad
01.2019 - 09.2023

Resident Engineer

Destini Berhad
11.2016 - 12.2018

Resident Engineer

LBS Berhad
06.2015 - 11.2016

Project Engineer

YNH Berhad
02.2014 - 05.2015

Microsoft Project 2010 (Basic & Intermediate)

01-2014

ISO 9001:2008 (Internal Auditor Training)

09-2013

ISO 9001:2008 (Awareness Training)

09-2013

Safety & Health at work

12-2012

Site Engineer

T&T Pacific
01.2012 - 01.2014

Army Officer

Malaysian Army
01.2006 - 11.2012

UPNM

Bachelor of Science from Civil Engineering
04.2001

NIOSH Malaysia

Some College (No Degree) from Safety And Health Officer Certificate

Institut Kejuruteraan Medan (IKEM), Malaysian Army

Adam IsmailCivil Engineer